How many cubic feet cement make 50 kg cement?

1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft 1 bag=50kg=1.25cft


How many 50-kilo-bags of cement is needed to fill 102.16 cubic feet. Area is 9.5 meters by 3 meters?

1 50kg bag fill about 2 cubic f. so for 102cu.f. you'll need 51 bags


How many 50kg cement bags can fill a 20ft container?

A standard 20ft container has a volume of approximately 33 cubic meters. Given that a 50kg cement bag occupies about 0.035 cubic meters, you can fit roughly 942 bags in a 20ft container (33 cubic meters / 0.035 cubic meters per bag). However, actual capacity may vary based on the packing method and the presence of any additional packaging materials. It’s advisable to consult with a logistics provider for precise calculations based on specific cargo configurations.


1m3 of cement equals how many 50kg cement bags?

20


How many square meters will a cubic meter of cement cover?

the size of you!>!CK


How many 50kg cement bags in 20 ft container?

560 bags


How many 50kg bags of cement fits into a standard 20ft container?

500bags


How many bags of cement in m30 grade concrete for 1 cum?

8.4 beg (per beg 50Kg.) (420kg cement)


How many 40 kilograms bags of cement needed in 15 x 17 ft by 4?

To find the number of 40 kg bags of cement needed for a volume of concrete measuring 15 x 17 ft x 4 ft, first calculate the volume in cubic feet: 15 x 17 x 4 = 1020 cubic feet. Next, convert cubic feet to cubic meters (1 cubic foot = 0.0283168 cubic meters), resulting in approximately 28.8 cubic meters. A general rule of thumb is that one cubic meter of concrete requires about 350 kg of cement, so you would need about 10,080 kg of cement for this volume. Dividing 10,080 kg by 40 kg per bag gives you 252 bags of cement.


How many bricks required in 1 cubic meter of brick work and how many cement and sand?

The number of bricks required for 1 cubic meter of brickwork typically ranges from 500 to 550 bricks, depending on the size of the bricks and the mortar joint thickness. For the mortar mix, a common ratio is 1 part cement to 6 parts sand, which would require approximately 0.3 cubic meters of sand and about 0.05 cubic meters of cement for 1 cubic meter of brickwork. This can vary based on the specific mix design and construction practices used.


How many cubic meters of cement are needed to cover a walkway 7 m long o95 m wide 10 centimeters deep?

To find the volume of cement needed, first convert the depth to meters (10 cm = 0.1 m). Then, calculate the volume by multiplying the length, width, and depth: 7m x 0.95m x 0.1m = 0.665 cubic meters of cement are needed to cover the walkway.


How many 50kg bags of cement required for 1cubic mortar?

Well, darling, if you're mixing cement mortar at a standard mix ratio of 1:6 (cement:sand), you'll need approximately 8 bags of 50kg cement to make 1 cubic meter of mortar. But hey, who's counting when you're having a blast building something fabulous! Just grab those bags and get mixing, honey!