Want this question answered?
This past week I visited a limestone quarry that has been mining limestone in one place for 40 years. In that time, they will have mined millions of tons of limestone. Usually nearly ALL the rock is limestone, so the answer will depend on the size (area) of the quarry, how deep you can mine, and presence of any "trash" rock.
Limestone was discovered in the deep oceans where there is a little movement of water. Almost it is found in all parts of the world.
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
Inches are a measure of length, and gallons is a measure of volume. However, volume can be measured in units of length cubed (because, for instance, the volume of a cube is the length of each side cubed).The are 231 cubic inches (or in3) per gallon.
One metre is 3 feet 3.37 inches. If you are standing in a water 1 metre deep you would not drown, it would come somewhere around waist height.
That depends on how DEEP you want the concrete !
Around 162,926
if that is 3 ft deep it would require 96 yards... IF it is 3 inches deep it would require 24 cubic yards
Volume = 12 X 20 X 1/3 = 80 cubic feet Cubic yards = 80/27 = 2.96
Usually a cubic yard will cover 15 square yards at 3 inches deep so I would reckon on 22 cubic yards. Hold on that I've got that wrong it's 2 cubic yards .Sorry.
How deep do you want that ?If you want it 1.6 inches deep, then it can cover 1 square foot.If you want it 10-ft deep, then it can't cover that much area.
the actual depth in a 52 inch tall pool would be 46 inches deep
54sqare feet
4.4 bags for each 1-foot deep. 2.2 bags for each 6-inches deep. Each 5-ft3 bag will cover the area to 2.72 inches deep.
That depends entirely on what kind of sand how deep you spread it. As an approximation, you could assume a bulk density for dry sand of about 110 lb/ft3. One ton (2000 lb) of sand would thus be about 18.18 ft3 or 0.673 yd3. If you spread it 6 inches deep you could cover about 4 square yards. At a foot deep, you would cover 2 square yards. At 3 inches deep you would cover 8 square yards. At 1 inch deep you would cover 24 square yards Reported bulk densities for sand range from 78 lb/ft3 for molding sand to 130 lb/ft3 for moist sand.
tweleve
You would need about 13 cu yards or about 15 tons.