315
in two days ther are: - 48 hours - 1440 minutes and .... - 86400 seconds
If the question is about CENTIMETRES in a QUARTER of a metre, the answer is 25.
60 minutes is the as an hour so if in 1 hour the is 1 500 loads therefore for 24 hours it will be 36 000 loads
There are 125 cm in one and a quarter meters
365 days multiplied by 24 hours in a day= 8760 hours in a year. Take 8760 hours multiply by 60 minutes in a hour= 525,600 minutes in a year. Take 525,600 minutes and multiply it by 60 seconds in a minute= 3,153,600 seconds in a year
Ther are 2 because 2/8 = 1/4
There are 525,600 minutes in a normal year and 527,040 minutes in a leap year.
3000 minutes Divide by '60' to calculate the hours. 3,000 / 60 = 500 hours. Divide by '24' to find the number of days. 500 / 24 = 20 5/6 days ( 20 .8333.... days).
Ther are: 17.5*24 = 420 hours
There are 168 hours in 7 days 24x7= 168
21 miles / 21 minutes, x 60 (mins per hour) is 60 miles per hour
you invention of bobby ther is nono