answersLogoWhite

0

The obvious answer here is one.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

If it takes 7 people 8 days to dig a ditch how many people would it take to dig the ditch in 12 day?

That my friend would take 11 people to dig the ditch. thanku pls. X Wouldn't it be 3 to 4 people? 3.5 to be exact.


It takes 7 people 8 days to dig a ditch how many people would it take to dig the ditch in one half day?

112 people are needed


If it takes 3 people to dig a hole how many does it take to dig half a hole?

its impossible to dig a half a hole, its either you dig a hole or ya dont.


How many days does it take to dig half of a big hole when 2 people dig a big hole in7 days?

3.5 days


If it takes 10 people 10 days to dig a hole how long will it take 5 people to dig half a hole?

5 days


If it takes 2 people to dig a 20 by 30 ditch how long does it take 4 people?

45 minutes


Where can you hear dig dig dig?

at an archeological site, where people are digging for lost, ancient treasures


How many levels are there in dig dig?

there are 20


Do people still dig graves?

Yes, people still dig graves because of their culture,beliefs and traditions.For example i Fiji, if a person died the relatives are the one who will dig the grave. People dig graves using a backhoe these days, not a shovel.


How long is the big dig?

i need somthing to mack my dig long and take long


How long would it take to dig a hole to the core?

it would take you 300 days to dig all the way down to the core


How long does it take to dig a 5 foot cubic hole This would be using medieval tools like shovels Digging at a rate of normal loboring for the time period?

There is no answer to that. It would depend on how fast you dig, what you are digging into, what tools you are using, like a shovel or a spade or a hydraulic digger and how many people are working on it.