15 cubic yards
15 cubic yards
24 x 40 x 12in = 24ft x 40ft x 1ft = Volume = 24 * 40 * 1 = 960ft³ = 9.865yd³
Yards are for measuring length not volume. Cubic yards required will be as follows: 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet Your concrete pad is 30ft x 40ft x 0.3333ft (4 inches assumed) = 400 cubic feet 400 divided by 27 = 14.8148 cubic yards required
12 sq yds
12 inches * 40 = 480 inches
First of all divide 2" by 12" to get 0.1666 feet; then multiply 0.1666' x 40' x 40' which equals 266.56 cubic feet; Multiply 266.56 cubic feet x 0.03704 to get 9.8734; Therefore, 2 inches of topsoil from an area 40 feet by 40 feet = 9.87 cubic yards. Hope that helps. The number 0.03704 is purely a conversion rate for cubic feet to cubic yards.
( 1 yard = 3 feet )40 / 3 = 13 remainder 1 = 13 yards 1 foot
The area of a room 40ft by 40ft = 1,600 square feet.
3 feet = 1 yard so 40 feet = 13 yards and 1 foot.
3 yards 1 foot is 20 inches greater than 100 inches36 + 36 + 36 + 12 = 72 + 48 = 120It is: 3 yd and 1 ft which equals 120 inches
40ft
500 inches is greater than 40 feet because each foot is comprised of 12 inches, therefore, 40 x 12 = 480 inches, which is 20 inches less than 500 inches.