Be notified when an answer is posted
20' by 26' by 5" requires at least 10 cubic yards of cement.
10" tubes require .55 cubic feet per running foot of "tube" length.
at present condition 10*10 room how much bricks and cement and iron rod and blue stone Required
ten us dallor 10$
Bar Rescue - 2011 Meat Sauna 3-10 was released on: USA: 14 April 2013
A minimum of 1.23 cubic yards at 4" thick.
which are top 100 cement companies in the world
one yard of cement will make a 8 x 10 square foot slab at 4 inches thick, that's 80 sq. feet per yard of cement at 4 inches thick.
Operation Repo - 2007 Cement Mixer 10-10 was released on: USA: 9 April 2012
when we test the cement with the help of Le-Chatlier apparatus and then we found if the expansion is more than 10 mm then the cement is said to be unsoundness
Currently, as of 12-9-12, about $350.00.
about 10% of the total number of tubes