Want this question answered?
Approximately $26.67 per Sq. Ft
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
Mix AExterior/ Exposed to dampnessArea of plaster per bag mixAll Purpose Cement Plaster thickness Area of wall (m2)Bags per (m2)110 mm120.08333333315 mm80.12520 mm60.166666667Mix BInterior/ Dry.Area of plaster per bag mixAll Purpose Cement Plaster thickness Area of wall (m2)Bags per (m2)110 mm150.06666666715 mm100.120 mm7.50.133333333
You will need 5.5 40kg bags for this floor. This allows for a typical waste factor of 5%
My wooden floor needs some protection and I was thinking to have linoleum flooring. What is the price I should get this for a 40 square meter area?
20
Daft question really! Should be what is the density of cement. Does the question mean cement ( dry powder), wet concrete, set concrete or what?
7 cement bags per 1 cubic meter of concrete......
It depends on the size of the concrete blocks
blocks of what size
300kg
Yo mam a
Depends entirely on the size of the individual blocks !
The mixture depends on the concrete strength, flow properties and other specifications required, quality of cement, aggregates and other chemical additives that will be used. Typically 1 cubic meter concrete should include about 310kg cement, 800kg sand, 900kg gravel and 220kg water.
15 milligrams
How much cement sand and stone do you need for 1 cubic meter of concre
30