I would mix it, 1 cement, 1 sharp sand, 4 ballast.
You would have: 1 part cement 5 parts of Ballast (Sand, gravel mix) And then add water till you get the disired mix quality
1 ton of green energy
How much cement sand and stone do you need for 1 cubic meter of concre
it depends on the type of mix and water cement ratio.
2million
1,000 kg
3 ballast, 2 sand, 1 cement.
I would mix it, 1 cement, 1 sharp sand, 4 ballast.
The number of shovels in 1 ton of ballast can vary depending on the size of the shovel and the material's density. On average, a standard shovel can hold about 10 to 15 liters of ballast. Since 1 ton of ballast is approximately 1,000 kilograms, and considering that 1 liter of ballast weighs around 1.6 kilograms, you can estimate that there are roughly 65 to 100 shovels in a ton of ballast.
A jumbo bag of ballast typically contains around 1 ton or 2000 pounds of material. This is equivalent to approximately 0.9 cubic meters or 31.5 cubic feet of ballast.
how much does a bag of cement and 1 ton of building sand cost in south Africa
1 USD per ton oh ulo moh!!
Well, darling, one ton of cement is equal to 1000 kilograms. So, if you're looking to make a ton of cement, you better have those 1000 kilograms ready to go. Don't skimp on the measurements, honey, or your concrete dreams will come crashing down.
You would have: 1 part cement 5 parts of Ballast (Sand, gravel mix) And then add water till you get the disired mix quality
To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.
1 ton is 2,000 lbs