it depends on the type of mix and water cement ratio.
6 bags.... depending on the mix ratio
according to my books you will need at least 50 bags of 60lbs of cement maybe more but less than 80 bags
The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.
different density need different sand ,cement and water , cement and water is about 2:1 , details please visiti website:httP://www.foamed.com.cn
If you have added too much water to your mix just add more sand and cement ;but do this right away.
3
For 1 meter cube of brick work, you would need approximately 13 bags of cement.
8 bags
6 bags.... depending on the mix ratio
94 pounds per bag.
To determine the number of 50kg cement bags required for 15 ratio mortar joints in a masonry wall with a volume of 10m³, we first need to know the mortar mix ratio and how much mortar is needed. Assuming a common mortar mix ratio of 1:4 (cement:sand), for 10m³ of masonry, you might need around 1.5m³ of mortar. If the density of cement is approximately 1440 kg/m³, you would need about 2160 kg of cement, which translates to 43 bags of 50kg cement (2160 ÷ 50 = 43.2). Therefore, you would requisition 44 bags of cement.
according to my books you will need at least 50 bags of 60lbs of cement maybe more but less than 80 bags
Oh, isn't that a lovely question! In a cubic yard, you can typically fit around 13-14 bags of cement, depending on the size of the bags. Just imagine all the wonderful things you can create with that much cement - it's truly a painter's dream!
4 bags of 50 kg each= 200 kg of cement.
From the largest manufacturer of backaged Portland Cement, bags come in 92.5 lb bags. To be clear, cement is mixed with sand and often aggregate (pea-gravel up to much larger rocks or other things such as broken out concrete chunks) to make concrete. Portland Cement by itself has no structural integrity when mixed with water. It must be mixed with sand at a minimum to make a hard, useful product (concrete). Concrete comes in bags weighing 50, 60, and 80 pounds here in the US.From the largest manufacturer of backaged Portland Cement, bags come in 92.5 lb bags. To be clear, cement is mixed with sand and often aggregate (pea-gravel up to much larger rocks or other things such as broken out concrete chunks) to make concrete. Portland Cement by itself has no structural integrity when mixed with water. It must be mixed with sand at a minimum to make a hard, useful product (concrete). Concrete comes in bags weighing 50, 60, and 80 pounds here in the US.
To hydrate a 50 kg bag of cement, approximately 25-30% of the cement weight is typically required in water, meaning around 12.5 to 15 kg of water is needed. This amount can vary based on factors such as the type of cement, environmental conditions, and specific mix designs. It's essential to follow guidelines and adjust based on the desired workability and strength of the final product.
6 Bags of masons lime