Related Questions

How much water is required in 1 bags of cement?

it depends on the type of mix and water cement ratio.


How would you describe the process of concrete setting?

Concrete setting is initiated by a process called hydration. Rather than the concrete just 'drying out', the hydration process involves the water added to the materials (stone, sand & cement) reacting with the cement. The water reacts with calcium in the cement to form an alkali paste which bonds the materials together. Adding too little water means not enough cement hydrates to set properly, but too much will cause separation of the materials.


How much 1 inch rebar goes into a cubic yard of cement?

As much as the engineered load calls for to perform the task the cement is required to perform.


How much bags of cement required for 1 cubic meter brickwork?

3


How much bricks sand and cement required to build ten feet by ten feet wall in India?

at present condition 10*10 room how much bricks and cement and iron rod and blue stone Required


How much water is typically stored in a Camelbak hydration pack?

A Camelbak hydration pack typically holds around 1.5 to 3 liters of water.


How much cement quantity FOR GROUT for 100 sft area?

How much cement required for grouting of block (16"x8"x8") wall for 100 sft area


How much water is the minimum amount required for survival?

The minimum amount of water required for survival varies depending on factors like age, gender, and activity level. However, a general guideline is about 2 liters (8 cups) of water per day for adults to maintain hydration and bodily functions.


How much sand cement and water needs 1M3 foamed concrete?

different density need different sand ,cement and water , cement and water is about 2:1 , details please visiti website:httP://www.foamed.com.cn


Is adding water to cement irreversible or revirsible?

If you have added too much water to your mix just add more sand and cement ;but do this right away.


How much mortar in 1m2 of brickwork?

1m2 of half brickwall required around 0.03m3 cement mortar


What are the signs of to much water?

There is a such thing called water intoxication. You will know when you had too much water, you may vomit the water out. But water intoxication (over hydration) is like drowning yourself.