22 cubic yards
To calculate the volume of a concrete slab, multiply the length, width, and depth. For a 10 x 12 x 4 slab, the volume is 10 feet × 12 feet × 4 feet = 480 cubic feet. Since concrete is typically sold by the cubic yard, convert cubic feet to cubic yards by dividing by 27. Therefore, you will need approximately 17.78 cubic yards of concrete for the slab.
100 sqft x (4/12) 33.33 cubic ft. Of concrete.
7.1
To determine how many bags of concrete you need for a 10 x 10 slab, first calculate the volume: a 4-inch thick slab is 10 x 10 x (4/12) = 33.3 cubic feet. A typical 80-pound bag of concrete covers about 0.6 cubic feet. Dividing 33.3 by 0.6 means you would need approximately 56 bags of concrete for that size slab.
800lbs
10-ft x 30-ft x 4-in = 100 cubic ft.That slab weighs 3.7 times as much as 1 "yard" of concrete. (rounded)
22 cubic yards
To calculate the volume of a concrete slab, multiply the length, width, and depth. For a 10 x 12 x 4 slab, the volume is 10 feet × 12 feet × 4 feet = 480 cubic feet. Since concrete is typically sold by the cubic yard, convert cubic feet to cubic yards by dividing by 27. Therefore, you will need approximately 17.78 cubic yards of concrete for the slab.
0.6 Cubic Yards
about how much to pour a concrete slaba 12 x 14'
100 sqft x (4/12) 33.33 cubic ft. Of concrete.
about 5 yards if your slab is 4" deep
7.1
To determine how many bags of concrete you need for a 10 x 10 slab, first calculate the volume: a 4-inch thick slab is 10 x 10 x (4/12) = 33.3 cubic feet. A typical 80-pound bag of concrete covers about 0.6 cubic feet. Dividing 33.3 by 0.6 means you would need approximately 56 bags of concrete for that size slab.
1.5 cubic yards of cement are needed for an 11' x 11' x 4" slab.
2