How much concrete do you need for a slab 10 foot by 10 foot by 4 inches?

A minimum of 1.3 cubic yards.


How much does a 10' x 30' x 4 slab of concrete weigh?

10-ft x 30-ft x 4-in = 100 cubic ft.That slab weighs 3.7 times as much as 1 "yard" of concrete. (rounded)


How many yards of concrete for a 10' by 10' slab 4 inches deep?

You'll need 1.23 Cubic Yards.


How much concrete is needed for a slab 10 feet in diameter by 4 inches thick?

A 10-foot round slab at 4 inches requires 1 cubic yard.


How many yards of concrete do i need for a 25x32x4in slab?

Assuming you need a slab 25 feet x 32 feet x 4" you would need 10 yards of concrete. 25 x 32 x .33 / 27 = 9.7 cubic yards


How much concrete you need for slab 12ft by 10ft by 4 inches thick.?

12 ft x 10 ft x .333 ft (4 in) = 39.96 cu ft. You need enough concrete for 40 cubic ft.


How much concrete you need for slab 12ft by 10ft by 4 inches thick?

12 ft x 10 ft x .333 ft (4 in) = 39.96 cu ft. You need enough concrete for 40 cubic ft.


How much concrete is needed to pour a slab 6 meters by 8 meters by 10 cm?

10 cm = 0.1 meterThe volume of the slab is (6 x 8 x 0.1) = 4.8 cubic meters


What would it cost for the materials and labor cost of pouring a 10'x10' concrete slab?

what is a concrete laborer's salary


How much concrete is needed for a 10' X 14' x 4 slab?

To calculate the amount of concrete needed for a slab measuring 10 feet by 14 feet and 4 inches thick, first convert the thickness to feet: 4 inches is approximately 0.33 feet. The volume in cubic feet is then calculated as 10' x 14' x 0.33' = 46.2 cubic feet. To convert this to cubic yards (since concrete is often sold by the cubic yard), divide by 27: 46.2 cubic feet ÷ 27 = approximately 1.71 cubic yards. Therefore, you would need about 1.71 cubic yards of concrete for the slab.


How many bags of concrete to pour a 4 inch slab 8' x 10'?

20


HOW MANY square yards of concrete is needed for a 10'x8' slab?

8 square yards