Check
when was the titantic built
inverted its a thing of style or the guy that built the box he didn't measure the depth of the sub
The Honda Accord Coupe built in 1999 has 6.5 inch speakers in the front doors. These speakers have a depth of 2.9 inches depending on the exact interior package purchased.
Barges are built for maximum weight bearing while other boats are built to move fast. Depth and shape of the hull is characteristic to the way the boat will be used and the speeds it will travel.
Depth of water
To find the difference between the initial and final depth of water is to subtract the final depth by the initial depth. The initial depth of what is what the water depth starts at and the final depth is the depth of the water once it is finished filling up.
Implied depth is overlapping to create depth in a work of art.
The phrase "as-built" in construction is equivalent to "as-is." Drawings deemed "as-built" are thus drawings that show the EXISTING conditions as they are, or "as-is" — these are the actual existing conditions as opposed to designs or proposed conditions, which are more common for the content of drawings. As-built drawings can be documented either after or during construction. When it's after construction, a qualified technician collects accurate data to reconstruct the drawings. When it's during construction, the design drawings are redmarked for editing. For example, if you are a Contractor installing sewer pipe in the road at a buried depth of 5.00' and you suddenly encounter an abandoned pipe and must change your buried depth to 6.50' , then you should be responsible for the as-built conditions. The installing contractor should redmark his set of drawings to show how the sewer line was actually installed so that a draftsman can later edit the drawings into an "as-built" set.
The phrase "as-built" in construction is equivalent to "as-is." Drawings deemed "as-built" are thus drawings that show the EXISTING conditions as they are, or "as-is" — these are the actual existing conditions as opposed to designs or proposed conditions, which are more common for the content of drawings. As-built drawings can be documented either after or during construction. When it's after construction, a qualified technician collects accurate data to reconstruct the drawings. When it's during construction, the design drawings are redmarked for editing. For example, if you are a Contractor installing sewer pipe in the road at a buried depth of 5.00' and you suddenly encounter an abandoned pipe and must change your buried depth to 6.50' , then you should be responsible for the as-built conditions. The installing contractor should redmark his set of drawings to show how the sewer line was actually installed so that a draftsman can later edit the drawings into an "as-built" set.
No, depth is not a vector.
what is the depth
indepth in depth