answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: How much work you need to move a 280n shed to a platform 5 m above?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How much work is needed to move a 280 N shed to a platform 5 m above?

1400 Newton-meters = 1400 joules


Where does angus young stand on stage?

He stands pretty much everywhere. He duck walks here and there and goes on this platform right above the drummer.


Calculate how much work you need to move the 130 N trunk to a ledge 2 m above?

260 J.


How much is a coin in this platform to dollars?

a coin is 10cent.


Can guinea pigs survive temperature above 85 fernhiet?

They can once or twice and will not move that much, but being in 85F everyday is not very healthy for them.


How much work do you need to do to move the 130 N trunk to a ledge 2 m above?

at least 260 newton-meters (260 joules)


How much do basic queen platform bed drawers cost?

Basic queen platform bed drawers have a very wide range of pricing depending upon the material used to construct the platform. The most basic queen platform beds cost between $300 and $600.


Can you use a vertical platform lift in a home, if so, how much does t cost?

Yes, there are platform lifts that can be used in the home. You can get information at http://www.usmedicalsupplies.com/Vertical-Platform-Lifts.htm or http://www.bruno.com/vertical-platform-lifts-home.html. Depending on what you need, they can cost around $4000.


At a given rotational speed how does linear speed change its distance from the axis changes?

In The Center Of The Rotating Platform Right At Its Axis You Have No Linear Speed At All, But You Do Have Rotational Speed. Your Rotational Speed would Stay The Same But As You Move Away From The Center Your Linear Speed Gets Faster And Faster. If You Move Twice As Much From The Center Your Linear (Tangential) Speed Would Also Be Twice as Much


A man is carrying cement blocks weighing 200 newtons up a ladder to a platform 7 meters above the ground He has been carrying 2 blocks per minute How much work is done in 10 minutes?

28,000 J


A man is carrying cement blocks weighing 200 Newton's up a ladder to a platform 7 meters above the ground he has been carrying 2 blocks per minute how much work is done in 10 minutes?

28,000 J


A man is carrying cement blocks weighing 200 newtons up a ladder to a platform 7 meters above the ground. He has been carrying 2 blocks per minute. How much work is done in 10 minutes?

28,000 J