Want this question answered?
Electrical equipment that is defective should be where possible repaired and if not repairable it should be replaced.
All electrical equipment, regardless of the voltage, should have a voltage supply that is no more than plus or minus 5 per cent of the equipments stated voltage requirement.
d. Dialtetric Strength
Any test equipment that your life may depend on when using it must first be tested before being used. These types of test equipment usually have internal apparatus that can verify that the equipment is working perfectly before it is used by personnel. Linesmen use this type of test equipment before working on primary voltage lines.
Yes it coudl damage equipment. Check voltage rating on equipment. However, there should be an adjustment somewhere on the generator to set the voltage properly. Also make sure your meter is calibrated. Check a known voltage source such as an outlet and compare readings.
Electrical equipment that is defective should be where possible repaired and if not repairable it should be replaced.
The electrical cleaning equipment should be grounded. This grounding is what protects the operator from a serious shock should the the cleaning equipment have an electrical fault occur.
The electrical cleaning equipment should be grounded. This grounding is what protects the operator from a serious shock should the the cleaning equipment have an electrical fault occur.
electrical
The electrical auxiliary equipment should be thought of as spares. If important stuff breaks down you can just use the auxiliary equipment and don't have to go to the store.
Electrical equipment should be tested every 6 months like your smoke detectors and your furnace . Electrical fires are the 3rd leading cause of fires in Canada, so test ,test test.
No-one should work on live electrical equipment without training, and the training would answer that question. Always turn equipment off and unplug before doing any work.
As with any electrical equipment Macs and moisture should not be combined.
Electrical equipment no longer used in the workplace should be disconnected from the power grid, at the least. Where reasonable, it may be removed and its metal components sold for scrap.
Test and inspection of electrical equipment should always be carried out when commissioning . This will done before voltage is applied , usually known as dead testing to verify the suitability . Live testing will then be carried out to confirm compliance with regulations .
Unplug all electrical equipment
Unplug all electrical equipment