53 and 1/3 cubic feet, concrete is normally sold buy the cubic yard, this would be 1.975 cubic yards. Figure on 2.25 CU yards to be safe. You do not want to run short when pouring concrete.
greater
40feet (12m)
24 ft * 40 ft = 960 ft2
488 inches
500 inches is 20 inches longer than 40 feet.
9 multiplied by 40 is 360. So the answer is 360 square feet.
This question cannot be answered in a sensible way. A square yard is a measure of area, with dimensions [L2]. The measure of the hole / trench is in cubic feet which is a measure of volume, with dimensions [L3]. Basic dimensional analysis teaches that you cannot convert between measures with different dimensions without additional information.
to find square feet multiply length by width. in this example 40x60 the answer is square feet 40x60=2400sqft
About 40 feet. (Average of half an inch per month=6 inches a year X 80 years=480in =40feet).
40 feet (12 meters) to 100 feet (30 meters).
The hypotenuse is the side of a triangle opposite of a right angle. If you know the lengths of the two legs, or the two sides that are not the hypotenuse, you can use the Pythagorean Theorem to find the hypotenuse. This theorem states that the sum of each leg squared (a squared and b squared) equals the square of the hypotenuse (c squared). a2 + b2 = c2 So: 402 + 242 = c2 1600 + 576 = c2 46.65 = c So, if one leg is 40 feet, and the other is 24 feet, the hypotenuse is about 46.65 feet long.