answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: If the program is on the DOT and E oversight list which test and evaluation (T and E) product is required before full rate production decision review?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about English Language Arts

Is decision maker one word?

It is not one word if you simply join the two parts, but if you put a hyphen between them, it is: decision-maker. The hyphen is required, because "decision" is too long to be joined to "maker" without a hyphen. Words like rainmaker and peacemaker do not require hyphens, because the word joined to "maker" is short.


Is 'near-miss' an oxymoron?

Sure. No. Near would mean close but not quite touching, and miss also means nearly hitting, or not hitting what you where trying to, but either way you look at it, the words are not opposites, which is required to be an oxymoron, such as awfully good, or military intelligence... Near miss might be best described as a redundancy, in keeping with Answer B, and the old saw: A miss is as good as a mile. Presidential Oversight... Is this an oxymoron? Tricky, given that 'oversight' is really a Janus word, a word which also means its opposite. I love military intelligence-- this could become a very entertaining stream...


Which is correct What are the information required or What is the information required?

What is the information required? Information is singular.


What is the definition of buyback joint venture?

it is formed when each partner required the same component in its production process. it means a productión facility of a certain minimum size in needed to achieve economies of scale but neither partner alone enjoys enough demand to warrant building it.


When we use verb require and when we use verb required?

required is the past tense or the past participle of verb require.require / required / required.Use require when making present simple sentences egThey require a ten percent deposit. OR The mechanic requires a ten percent deposit. OR She requires a ten percent deposit etc.Use required when making past simple sentences egThe travels agents required a ten percent deposit. OR He required a ten percent deposit etcUse the past participle required when making present/past perfect sentences egThey have required a ten percent deposit. He has required a ten percent deposit.Last year he had required a ten percent deposit.OR when making a passive sentence egA ten percent deposit is required.

Related questions

What test and evaluation product is required at milestone C?

At Milestone C, a production representative system, also known as a production representative prototype, is required for testing and evaluation. This prototype should closely resemble the final production system and is used to assess the system's performance, readiness for production, and ability to meet user requirements. Additionally, operational testing and evaluation are conducted to verify the system's effectiveness in a realistic operational environment.


Why is sales forecast a key element in a capital budget decision?

Sales forcast determines that how much production is required and then to meet that production level how much new investment and machinery etc required.


Which one of the following T and E products is required at the Full Rate Production Decision Review?

OT&E Results


Use evaluation in a sentence?

Providers are not required to undertake an evaluation at the resource.


How much money does a mental evaluation cost?

The cost of a mental evaluation depends on what kind of evaluation is required and where it the world it is performed.


What is the relationship between production and cost?

The relationship between production and cost in any manufacturing process varies based on volume produced and whether any part of the manufacturing process is outsourced or performed by subcontractors. Additionally, production and cost ratios vary based on the amount of automation involved in production and the amount of human oversight and involvement required.


How do you calculate the production line personnel required?

How do you calculate the production line personnel required?


Why measurement is required?

it is required to improve the efficiency of production.


What is the relationship between test measurement and evaluation?

The relationship between the three concept of test,measurement and evaluation are closely related with evaluation coming first followed by measurement and test.The relationship is such that if the need of evaluation arises,it required measurement which will reguired the used of test


Which of these is required for the body's production of energy?

oxygen


Which of these is required for the body's production of energy?

oxygen


What is a sentence with the word production?

The production team were very busy.Plants are required for the production of oxygen.Our production lines on the factory floor have broken down.