There are 52 weeks plus 1 day in a non-leap year and 52 weeks plus 2 days in a leap year.
365 as there are 7 days in a week and 365 in a year
There are 365 days in a year, 7 days in one week. So 365 divide by 7 is 52
No. 365 days = 1 year 366 days = 1 leap year Neither 365 or 366 is divisible by 7 (days a week). 1 year has 52 weeks and 1 day. 1 leap year has 52 weeks and 2 days.
Considering 2011 is not a leap year, it has 365 days; having 7 days in a week, 365/7 = 52 weeks plus 1 day.
365 days = 52 full weeks365 days * 1 week/7days= 52.14 weeks= 52 full weeks
365 as there are 7 days in a week and 365 in a year
There are 365 days in a year, 7 days in one week. So 365 divide by 7 is 52
Two weeks on 1 week off means you are on for a third of the time. So in a year (=365 days), you should be on 2*365/3 = 2431/3 days.
No. 365 days = 1 year 366 days = 1 leap year Neither 365 or 366 is divisible by 7 (days a week). 1 year has 52 weeks and 1 day. 1 leap year has 52 weeks and 2 days.
An "ordinary" year has 365 days. 1 week = 7 days. 365/7 = 52weeks 1day
Considering 2011 is not a leap year, it has 365 days; having 7 days in a week, 365/7 = 52 weeks plus 1 day.
365 days = 52 full weeks365 days * 1 week/7days= 52.14 weeks= 52 full weeks
Well, that's obviously not exact. 52 (weeks) x 7 days (per week) is only 364 days. There are 52 weeks plus one day in a year, usually. There are 365 days in a year, with 366 days in a leap year. If you look at calendars, you will see that the day of the week that January 1st is on changes each year. The length of a year is based on the time for the Earth to orbit the Sun. The exact length of that period is actually close to 365.2422 days. That's why we use 365 days plus leap years.
52 weeks and that makes 365 days a year or 365 1/4 days on leap year. that answer ya question.
Same as any other year (apart from leap) 365 days 52 weeks +1day.
365 days in a year (except leap years that have 366) The average is thus 365.25 days to a year but really there are close to 365.2422 7 days in a week 52 weeks + 1 day (sometimes 2) in a year
7 days a week 2 days = weekend 5 days = working week days 52 weeks = 1 year 5 x 52 = 260 working days in a year or 365 days = 1 year 365 x 5/7 = 260.714... so nearly 261