You will change the electrical service once construction is complete. You can normally call to have service on 24 hours prior too move in.
If the electrical contractor has all of the materials ready for the job, the man hours should be about eight hours.
For a 100 amp electrical service, a service entrance cable of at least 2 AWG copper or 1/0 AWG aluminum should be used.
Key components that should be included in electrical plans for a building project are the layout of electrical outlets, lighting fixtures, switches, and circuitry, as well as specifications for the electrical panel, wiring, and any special requirements for the project.
Are you asking about home electrical service? sevrice entrance cables need to be three feet away from a window
it should be 5 feet
Windows that can be opened.
no
no
The electrical is down at 36". It should not affect your driveway.
The ditch for a 200 amp service should typically be 24 to 30 inches deep to meet electrical code requirements and ensure proper protection for the service conductors. It's important to follow local building codes and regulations when determining the depth of the ditch to ensure safety and compliance with electrical standards.
CEC - any window that has the capacity to be opened.The exterior electrical service wires should be at least 3 feet away from any part of any window that is able to be opened.
For a 50 amp service, a 6-gauge wire should be used to safely handle the electrical load.