Cost is the correct term to use, whether it be direct costs such as materials and labor or indirect costs such as overhead or supervision.

User Avatar

Wiki User

16y ago

What else can I help you with?

Related Questions

How do you calculate cost price?

Total cost price = Material cost + labor cost + overheads costs


What is the warehouse construction cost in haryana and Punjab?

The constructions costs for setting up a warehouse in Haryana and Punjab can not be predicted since there is not standard price for construction. It depends on the vicinity, city, size of plot, and type of material that will be used in construction.


Is direct material used a product cost?

Yes direct material is part of product cost and included in calculating the product price.


What is prime cost in construction?

Prime cost is as follows:1 - Cement (Raw material)(direct material)2 - workers (direct labor)


How do you save construction cost?

Br effectively execution and proper planing


Where can someone download the Construction Cost Estimator app?

You can download the Construction Cost Estimator app on websites like iTunes and Appato. Both websites give you the ability to download the Construction Cost Estimator app for a small price.


What is the average cost of desks?

Most desks cost anywhere from $100 to $1,000, depending largely on the quality of construction and material.


How much does a ticket cost for a construction violation in Nevada?

In most states this is double the normal price for the same violation in a non-construction zone.


What causes an increase in market supply?

a decrease of price in the cost of raw material.


When did plywood become a common material used in home construction?

Plywood became a common material used in home construction during the mid-20th century, gaining popularity for its strength, versatility, and cost-effectiveness.


What is material cost variance?

The material cost variance denoting the difference between the standard cost of materials and actual cost of matrials. The material cost variance is between the standard material cost for actual production in units and actual cost. The total cost is usually determined by two differenct factors of influence viz quantity of materials utilized/ required and price of the materials. The fluctuations in the material cost are only due to the fluctuations in the utility of materials due to many factors. Material cost variance can be computed into two different ways: DIRECT METHOD AND INDIRECT METHOD material cost variance= Standard cost of materials for actual output- actual cost of raw materials. MCV=(S Q AO X SP)-(AQ X AP) Indirect Method: material cost variance= Material price variance (MPV)+Material usage Variance


What are the three main costs that are included in the price of a product?

1 - Raw material cost 2 - Direct labor cost 3 - Overhead Cost