answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: In the execution of maintenance projects each trigger from the customer is recorded in a?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Industrial Engineering

What is the total manufacturing cost recorded for Job 1225?

500 billion dollars wise guy


What is the Air Force One color sheme?

The Air Force had attempted a special presidential livery of their own design: a scheme in red and metallic gold, with the nation's name in block letters. Kennedy felt the aircraft appeared too regal and on advice from his wife, First Lady Jacqueline Kennedy, he contacted the French-born American industrial designer Raymond Loewy for help in designing a new livery and interiors for the VC-137 jet.[4] Loewy met with the president, and recorded that his earliest research on the project took him to the National Archives where he looked at the first printed copy of the United States Declaration of Independence, and saw the country's name set widely spaced and in upper case in a typeface called Caslon. He chose to expose the polished aluminum fuselage on the bottom side, and used two blues; a slate-blue associated with the early republic and the presidency, and a more contemporary cyan to represent the present and future. The presidential seal was added to both sides of the fuselage near the nose, a large American flag was painted on the tail, and the sides of the aircraft read UNITED STATES OF AMERICA. The result of Loewy's work won immediate praise from the president, the press, and the jet's livery became a global icon. The VC-137 markings were adapted for the larger VC-25 when it entered service in 1989. SAM 26000 was in service from 1962 to 1998, serving Presidents Kennedy to Clinton, but was replaced by another VC-137, Special Air Mission 27000 in 1972. Richard Nixon was the first president to use this, and the aircraft would continue serving every president since, until it too was replaced by two VC-25 aircraft (SAM 28000 and 29000) in 1990. SAM 27000 was decommissioned in 2001 by President George W. Bush, flown to San Bernardino International Airport in California, and later driven in pieces to the Ronald Reagan Presidential Library in Simi Valley where it was reassembled and is currently on permanent display. Air Force One has a color scheme of a white body from the mid section up, a light or powder blue base, from the windows down, and a front face of a deeper carribean blue around the face and sweeping back to a belt along the middle window row. The wings are bare metal silver.


Steps in production planning and control?

a-planning,b-routing,c-scheduling,d-loading,e-dispatching,f-follow up,g-inspection1. PlanningThe first important step inis concerned with the careful preparation of production plans. Production plans determine what will be produced and where, at what type, by whom, and how. For detailed planning of operations, the relevant information may be obtained from several sources in the enterprise. Information about quantity and quality of products to be manufactured may be obtained from customers' orders and the sales budget, and information about production facilities may be obtained from the management and the engineering department. Thus, the planning function formulates production plans, and translates them into requirements for men, machinery and materials. Whatever be the planning period, helps in avoiding randomness in production, providing regular and steady flow of production activities, utilizing production facilities to its maximum for minimizing operating costs and meeting delivery schedules; coordinating various departments of the enterprise for maintaining proper balance of activities, and above all, providing the basis for control in the enterprise.2. RoutingThe next important function of production planning and control is routing which involves the determination of the path (i.e. route) of movement of raw materials through various machines and operations in the factory. "Routing includes the planning of where and by whom work shall be done, the determination of the path that work shall follow, and the necessary sequence of operations". To find this path, emphasis is placed on determining operating data, which usually includes planning of 'where' and 'by whom' work should be done, the determinations of the path that work shall follow, and the necessary sequence of operations. These operating data are contained in the standard process sheet which helps in making out a routing in the standard process sheet which helps in making out a routing chart showing the sequence of operations and the machines to be used. If the machine loan chart indicates the non-availability of certain machines, alternate routing may also be included on the routing chart. The most efficient routing may have to be compromised with the availability of the machines at a particular time. In other words, "routing establishes the operations, their path and sequence, and the proper class of machines and personnel required for these operations." From the above, it can be inferred that routing is one of the highly essential elements and prime considerations of production control because many production control functions are closely related processes and are dependent on routing functions. Thus, it is essential to solve the different problems concerning: appropriate personnel; ; and.4. SchedulingScheduling is planning the time element of production - i.e. prior determination of "when work is to be done". It consists of the starting and completion times for the various operations to be performed. In other words, scheduling function determines when an operation is to be performed, or when work is to be completed, the difference lies in the details of the scheduling procedure. To work out effectively, the scheduling, as a part of , determines the time when each operation called for on the route sheet is to be done on the specified machine in order to meet the desired delivery dates. Good control function directs not only the time that each particular operation should start but also indicates the progress of each manufacturing part, the amount of work ahead of each machine, and the availability of each machine for the assignment of new work. Schedules are of two types: Master schedule and Detailed schedule. Activities, if recorded on plant-wise basis, would be preparing master schedule, while mere detailed schedules are employed to plan the manufacturing and assembly operations required for each product.5. Dispatching* Dispatching is the part of production control that translates the paper - work into actual production. It is the group that coordinates and translates planning into actual production. Dispatching function proceeds in accordance with the details worked out under routing and scheduling functions. As such, dispatching sees to it that the material is moved to the correct work place, that tools are ready at the correct place for the particular operations, that the work is moving according to routing instructions. Dispatching carries out the physical work as suggested by scheduling. Thus, dispatching implies the issuance or work orders. These work orders represent authority to produce. These orders contain the following information: * The name of the product; * The name of the part to be produced, sub-assembly or final assembly; * The order number; * The quantity to be produced; * Descriptions and numbers of the operations required and their sequence, * The departments involved in each operation * The tools required for particular operation; and * Machines involved in each operation and starting dates for the operations.6. ExpeditingExpedition or follow-up is the last stage in the process of production control. This function is designed to keep track of the work effort. The aim is to ensure that what is intended and planned is being implemented. "Expediting consists in reporting production data and investigating variances from predetermined time schedules. The main idea behind expedition is to see that promise is backed up by performance". It includes the following functions:* Check-up to ensure that all materials, tools, component parts, and accessories are available at all work centers in specified quantities for starting and carrying out manufacturing operations. * Check-up on the status of work-in-progress and completed work at various work stations. This includes collecting information relating to the starting and completion time and date of work completed, status of work-in-progress relative to scheduled completion dates, position of movements of materials, component parts, and sub-assemblies within the plant, and inspection results. * Preparation of progress records and keeping the control boards up-to-date. * Reporting to manufacturing management on all significant deviations so that corrective action may be taken. It also includes reporting to production planning department so that future plans may be adjusted. Thus production planning and control by completing the above discussed phases ensures the manufacturing of goods of right quality, quantity and at competitive market rates. One thing must be borne in mind that production planning and control is a never-ending process, and its various functions are inter-dependent.


Related questions

How can I stop a Writ of Execution in Texas?

You can resolve the execution by paying the debt in full. The creditor will notify the court of the payment and the execution will be dissolved. If the execution was recorded in the land records the court will issue a judgment satisfied certificate that must also be recorded.You can resolve the execution by paying the debt in full. The creditor will notify the court of the payment and the execution will be dissolved. If the execution was recorded in the land records the court will issue a judgment satisfied certificate that must also be recorded.You can resolve the execution by paying the debt in full. The creditor will notify the court of the payment and the execution will be dissolved. If the execution was recorded in the land records the court will issue a judgment satisfied certificate that must also be recorded.You can resolve the execution by paying the debt in full. The creditor will notify the court of the payment and the execution will be dissolved. If the execution was recorded in the land records the court will issue a judgment satisfied certificate that must also be recorded.


How is the maintenance of a fire extinguisher recorded?

It is recorded on a label on the unit itself, together with it being entered in to a log that the service company provides to the customer who either owns or leases the equipment. It can also be recorded in a fire log record book.Monthly maintenance is typically noted on an annual tag attached to each fire extinguisher, with office notation that all of them were inspected, plus annual testing, as may be required, all of which is logged in the fire prevention files.


Paul Jernigan's body was electronically recorded as the Visible Man How did Jernigan die?

Execution


What details need to be recorded from a customer complaint?

jo.


Is a customer's payment on account immediatly recorded in the checking account?

true


When merchandise is purchased to resell to customer's it is recorded in the account entitled?

merchandise inventory


In which journal is the receipt of a promissory note from a customer on account recorded?

The General Journal.


How quarterly income statements are affected by the behaviour of costs in repairs and maintenance?

Discuss the ways in which quarterly income can be affected by the behavior of the cost recorded in a repairs and maintenance of factory machinery account


What customer records should be kept and how customer records are maintained?

What customer record do you need to keep? Records of all customer feedback good and bad. These records will provide information about customer satisfaction with products and with product bundles. They are then applicable for performance management and measurement and should be linked to performance appraisals as well as being used as a base for continuous improvement. Sales detail should be recorded so that you can forecast and anticipate future sales. Complaints problems and issues should be recorded - types of problem or complaints and fequency of reporting. Measures taken to resolve these issues also be recorded.


Filled Customer Orders Collected transaction are recorded into the accounting system using what balance identifier?

The answer is R


What does the matching principal require?

requires that all credit losses be recorded when an individual customer cannot pay


You received a writ of execution on your real property?

Generally, there are two things that can happen. The sheriff will record the execution in the land records and may sieze and sell your property. Or, the execution will be recorded in the land records and the sheriff will suspend further action. In that case you will be unable to finance or sell your property until the debt is paid. You should also check your state laws.