answersLogoWhite

0


Best Answer

false

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Is it true when a forklift nameplate is only required when the capacity is unknown?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Industrial Engineering

What is the difference between independent-demand inventories and dependent-demand inventories?

An independent demand is a demand that is not based on the demand for another item while a dependent demand is based on the demand for another item. For example, the demand for chairs of a table and the table itself is based on the demand for the table. The table in this example is the item with independent demand. Knowing this, one can forecast an independent demand while dependent demands are calculated based on the independent demand item. Business to business independent demands tend to be demands for such items as capital goods, office supplies, MRO (maintenance, repair, and operating) items, and anything else for which the dependency is unknown. Independent demands are usually handled with standalone purchase orders, although some items might be covered by contractual relationships such as volume, price and other agreements.


What are flexible manufacturing systems?

A flexible manufacturing system (FMS) is a form of flexible automation in which several machine tools are linked together by a material-handling system, and all aspects of the system are controlled by a central computer. 1. The Flexible Manufacturing System (FMS) is a manufacturing methodology where an entire or partial production line including a material handling system has been automated in order to give it time to react in the event of unforeseen changes. There are three types of changes for which flexibility is needed, they are: Variability, Rare Events, and Uncertainty. Variability refers to foreseen changes in production these changes are planned, the second change is, Rare Events, this is where a potential problem has been identified and contingency plans are in place to deal with the problem, and thirdly: Uncertainty, this is where the variability of a problem and the way to plan for it is unknown and must be dealt with when it arises. All the automation takes place through Computer Integrated Manufacturing (CIM), CIM is nothing more than a central computer processing system that continually monitors and self -compensates or makes changes automatically through Programmable Logic Controls (PLC's) to meet its work load requirements.


Related questions

Is it true or false when a forklift nameplate is only required when the capacity is unknown?

True


What should you look for when inspecting the pneumatic wheels of a forklift?

a forklift nameplate is only required when the capacity is unknown true or false


When inspecting the pneumatic wheels of forklifts what should you look for?

a forklift nameplate is only required when the capacity is unknown true or false


What items are not part of the integral part of the forklift equipment but is used to hold a load or loads?

A forklift nameplate is only required when the capacity is unknown


What is the size of the human bladder?

The normal capacity of the bladder is 300 to 1000ml. However a bladder with the capacity of just over 2000ml is not unknown.


What are the powers of Skadi?

Superhuman strength; maximum capacity unknown; superhuman endurance and resilience; super leaping.


What is the area of 2ft by 4ft by 6ft?

It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.


What is the capacity of Eden Garden?

I don't think anyone is quite sure, considering that the location of the former Garden of Eden is unknown as of yet.


What is the capacity of a tank that when it is 58 percent full contains 10 qt of water?

58% of (full tank) is 10 qt Here is the corresponding equation, calling the unknown capacity "x"; solve it, and you get the capacity: (58/100)x = 10


Does executor of a will has to find unknown property of testator?

The executor must make a reasonable and diligent search for property. They cannot be "required" to find unknown property. The heirs and relatives should assist by notifying the executor of any property they have knowledge of.


What is the answer for x-2y equals 2?

It is not possible to solve one linear equation in two unknown variables. Another, independent equation is required.


Full explanation of poem question by unknown poet?

THIS WEBSITE IS WASTE OF TIME