false
An independent demand is a demand that is not based on the demand for another item while a dependent demand is based on the demand for another item. For example, the demand for chairs of a table and the table itself is based on the demand for the table. The table in this example is the item with independent demand. Knowing this, one can forecast an independent demand while dependent demands are calculated based on the independent demand item. Business to business independent demands tend to be demands for such items as capital goods, office supplies, MRO (maintenance, repair, and operating) items, and anything else for which the dependency is unknown. Independent demands are usually handled with standalone purchase orders, although some items might be covered by contractual relationships such as volume, price and other agreements.
A flexible manufacturing system (FMS) is a form of flexible automation in which several machine tools are linked together by a material-handling system, and all aspects of the system are controlled by a central computer. 1. The Flexible Manufacturing System (FMS) is a manufacturing methodology where an entire or partial production line including a material handling system has been automated in order to give it time to react in the event of unforeseen changes. There are three types of changes for which flexibility is needed, they are: Variability, Rare Events, and Uncertainty. Variability refers to foreseen changes in production these changes are planned, the second change is, Rare Events, this is where a potential problem has been identified and contingency plans are in place to deal with the problem, and thirdly: Uncertainty, this is where the variability of a problem and the way to plan for it is unknown and must be dealt with when it arises. All the automation takes place through Computer Integrated Manufacturing (CIM), CIM is nothing more than a central computer processing system that continually monitors and self -compensates or makes changes automatically through Programmable Logic Controls (PLC's) to meet its work load requirements.
True
a forklift nameplate is only required when the capacity is unknown true or false
a forklift nameplate is only required when the capacity is unknown true or false
A forklift nameplate is only required when the capacity is unknown
The normal capacity of the bladder is 300 to 1000ml. However a bladder with the capacity of just over 2000ml is not unknown.
Superhuman strength; maximum capacity unknown; superhuman endurance and resilience; super leaping.
It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.It is not posible to give an answer to the question. The shape for which the area is required is unknown. The question gives three measures but they are clearly NOT the sides of a triangle.
I don't think anyone is quite sure, considering that the location of the former Garden of Eden is unknown as of yet.
58% of (full tank) is 10 qt Here is the corresponding equation, calling the unknown capacity "x"; solve it, and you get the capacity: (58/100)x = 10
The executor must make a reasonable and diligent search for property. They cannot be "required" to find unknown property. The heirs and relatives should assist by notifying the executor of any property they have knowledge of.
It is not possible to solve one linear equation in two unknown variables. Another, independent equation is required.
THIS WEBSITE IS WASTE OF TIME