answersLogoWhite

0

What else can I help you with?

Related Questions

What is the estimated cost of a first time DUI once all potential costs are factored in?

Potential Average Costs Related to a DUI:Fines and court costs - $300 to $2,500Attorney fees - $2,500 to $10,000Bail - $150 to $2,500DUI Education School - $150 to $2,000Car towing and impounding - $100 to $1,200License reinstatement - $95 to $250Car ignition interlock device - $325 and upIncarceration costs - $10 to $50Increased preminums with auto insurance over one year - $5,000 to $10,000 over the next 5 yearsAdditional Expenses:Temporary loss of incomePeriodic blood testsMonthly monitoring feesLoss of Job


What is One potential cause of Total Manufacturing Overhead Variance?

If the estimated materials, labor or overhead costs allocated for a manufacturing order is different from the actual cost of the MO then the potential result is a Manufacturing Overhead Variance.


What is the potential costs of scarcity and choice?

Describe the potential costs of both scarcity and choice.


What is the difference between standard cost and estimated cost?

Estimates are the expressions of of opinion based upon past experiences whereas the standard costs are based upon standard rate that are very carefully developed and set as scientifically as possible. However, both estimated costs and standard costs are related to future period of time but there are some significant differences between them. Some major differences between standard costs and estimated costs are listed below:1. Estimated costs are the expressions of opinion based upon experience. Standard costs are based upon standard rates that are carefully developed and set as scientifically as possible.2. Estimated costs are used by those firms that follow historical costing system. Standard costs are used by those organizations that follow standard costing.3. Estimated costs are based on actual costs and anticipated costs. Standard costs are fixed after scientific analysis of relevant cost elements.4. Estimated costs are based on approximation. Standard costs are based upon specifications.5. Estimated costs are normally used as guideline for price determination, quoting the selling price etc. Main purpose of standard costs is to serve as a tool for cost control.


What is the difference between actual costs and budgeted costs?

Actual Costs are costs which have occurred and can be reliably measured. Budgeted Costs are costs which have been estimated, possibly by using Forecasted Costs.


How much does iPhone 2g costs roughly?

£1


Estimated costs of 100000 watts of electricity?

7 dollars.


What are the estimated yearly costs for Baylor university?

32,000-35,000


What is factored to the price?

"Factored to the price" typically refers to the process of incorporating various elements or costs into the final price of a product or service. This can include production costs, overhead, desired profit margins, and market demand. By factoring in these elements, businesses can determine a price that covers expenses while remaining competitive. Ultimately, it reflects the total value perceived by consumers based on the costs and benefits associated with the offering.


Costs of cloning?

It would cost roughly 250 million dollars


How much does the band aid cost?

It costs roughly 4$ to 6.50.


What is the estimated costs of running a flower shop?

About 10% less than you'll make. Fixed costs/ Variable costs? Cost of spoiled unsold flowers/