Pre-commissioning and commissioning are words used in the engineering field. Pre-commissioning begins many months before the start of the project. During this phase duties are assigned.
Depending on the equipment required for the substation,some of the tests are as follows: meggering,hi-pot testing,continuity checks,c.t. testing,relay testing,ngr testing, capacitance bridge test's on transformers.
during commissioning the equipment it is required to carry out 1.5 times static overload test,followed by 1.1 times dynamic winch brake test.
MECHANICAL MAINTENANCE,COMMISSIONING ERRCTION OF MACHINARIES,UTILITIES ETC Construction,errection,commissioning,and maintenance
Installation of a system or machinery up to the point of being able to start running is erection. Commissioning is preparing for running or taking into use of the installed system or machinery by making preliminary tests and checks (pre-commissioning) and initially running the system or machinery or taking it into use while checking and setting all of its running parameters in accordance with its design (hot commissioning).
Electrical commissioning is when a company has a equipment on standby to provide electricity if and when it is needed. During power outages this equipment will allow the company to remain up and running.
The definition from www.businessdictionary.com: Process by which an equipment, facility, or plant (which is installed, or is complete or near completion) is tested to verify if it functions according to its design objectives or specifications.
commissioning...its inspecting a piece of equipment or plant to make sure you got what you paid for...i.e. the vendor build the correct thing...part of it is making sure it is safe to start up. This can be done by comparing the as built to the drawings.
Pre-commissioning is the testing of non-energized systems. Commissioning is the testing of energized systems.
Commissioning a ship means putting that ship into service. The term is used for naval ships. It is a long process that includes multiple steps from launching and naming the ship through installing and and testing her equipment. The final process in commissioning a ship is the sea trial. Her commander and crew will take her on a sea voyage to identify any deficiencies so they can be corrected.
Pre-commissioning and commissioning are words used in the engineering field. Pre-commissioning begins many months before the start of the project. During this phase duties are assigned.
Commissioning can be of any machinery, unit, or plant. So the commissioning of a power plant or steel plant is somewhat similar.Commissioning denotes the trials of the component individually, machines, and it's part individually and as a whole and later on, all combined together( commissioning of the unit). After the commissioning of each unit, the plant as a whole is commissioned.
J. C. Agee has written: 'Excitation system commissioning procedures' -- subject(s): Hydroelectric power plants, Equipment and supplies
commissioning mean adjustment, testing, and tuning.
can anyone furnish me the method statement for commissioning of FM200 Systems
Depending on the equipment required for the substation,some of the tests are as follows: meggering,hi-pot testing,continuity checks,c.t. testing,relay testing,ngr testing, capacitance bridge test's on transformers.
Building commissioning offers measurable and scalable advantages to building owners/developers, construction and design teams, and occupants. Here are to name a few: Lowers Energy Costs: Energy tends to be the greatest operating cost for commercial building owners. Commissioning, at a very small cost, helps ensure that the building delivers the expected energy savings and performance. Decreases Change Orders & Other Claims: Commissioning helps bring cooperation between the building owner, design team, and contractor related to the design, construction, operation, and maintenance of the building. Fewer Deficiencies at Substantial Completion: When equipment is being installed during the construction phase, periodic site visits take place, and an assessment of the installed equipment is done as part of commissioning. This helps record progress and discover possible deficiencies as early as possible so that they can be resolved in time. Well-Documented & Managed Start-Up: A commissioning management platform outlines startup procedures for nearly all equipment and checklists for contractors based on manufacturer-defined procedures and industry-specific best practices. Smoother Building Turnover, Operations, and Post-Occupancy Advantages: A building commissioning software system plan will consist of processes for building operator/owner training. Buildings that implement commissioning are known to realise post-occupancy benefits like better thermal comfort, improved maintenance, extended equipment life, better air quality, etc. Complete Documentation: The commissioning plan and the resulting documentation obtained during the project is valuable to the building owner and operations team. Recorded training sessions, operations and maintenance manuals, etc. are all included in the commissioning plan. Fewer Project Delays and Value-Added Construction Quality: The commissioning process offers a comprehensive schedule and coordination-specific information that enable contractors to plan and arrange the required tasks efficiently. Problems are also identified and resolved with minimal delay, which helps keep the project on schedule. For more information visit at Gecko Software.