1) for cost control
2) comparison of cost with other firms
3) for cost reduction
needs of product costing system
Target costing is when you have a goal for the project and its costs. Absorption costing is when you need to fix the excess spending.
i need to find a cell phone location how do i do that without costing me a fortune to do it
we need plan 4 bedroom timber house and estimate costing for childs project
Job Order Costing Operation Costing Normal Costing Actual Costing Standard Costing Kaizen Costing Target Cost
Variable costing is called marginal costing while direct costing is separate concept.
because we need more and more lovvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvve
a job costing
outline the characteristics and purpose of: Job costing and process costing
Labour costing. Material costing
Yes marginal costing is also sometimes called direct costing.
full absorption costing