No one knows the exact amount of concrete used to build I-90. However, it did cost 1 billion dollars to build.
The average cost of making a concrete garage depend greatly on the size of the garage, materials used, and whether you build it yourself or hire a contractor. The average cost to build a concrete garage ranges from around $13,000 for a very small garage to as much as $45,000 for a large, custom concrete garage.
about 30 million per mile
The answer depends primarily on how wide the highway is and on what the concrete is used for: only the substratum or the surface as well.
The volume of concrete used to build the Millau bridge is 85,000 m3 (cubic meters). The weight of this volume of concrete is 206,000 metric tons.
10000yds
It is an average of 2.59 square kilometres.
about 6600000 tons of concrete!! natal
no
The cost to build a 2-mile sidewalk can vary significantly based on location, materials, and labor costs, but it typically ranges from $1 million to $2 million. Factors such as site preparation, drainage, and any required permits can also influence the total cost. On average, concrete sidewalks may cost between $5 to $15 per square foot, depending on local conditions. Therefore, for a 2-mile sidewalk, which is approximately 10,560 square feet, the cost can add up quickly.
The Hoover dam weighs 6,600,000 tons. It took 3,250,000 cubic yards of concrete to build the dam itself
The average concrete workers makes about $15.00 per hour. This wage varies across the country.
about.... £2.50? :D