To complete preliminaries in a bill of quantities you have to figure out the amount of the certain product that you used was. So you will pay so much based on how much of the material or product you needed.
easy to understand any one
They used steel and concrete!
H piles are similar to W sections, resembling what folks have always called I beams. They are sectionally designed to allow more effective transmission of moment and axial load than W sections which are largely used in for structural steel beams.
A drain made of clay sections pushed together. Old septic pipes were often made this way.
A bill of quantities is typically prepared by a quantity surveyor for the client or main contractor. It itemizes the quantities and costs of materials, labor, and services needed to complete a construction project based on the project's drawings and specifications.
bill of quantities
There are 13 sections in the "BILL OF RIGHTS" .
A bill of quantities is a list prepared by a quantity surveyor, of the quantities of materials needed for a specific project.
The two main types of bill quantities are lump sum and itemized. Lump sum bills provide a single total cost for a project, while itemized bills break down costs by individual items or services.
Following are main sections:1 - Trading account2 - profit and loss account.
what are the legal sihnificance of bill of quantity
It stands for Bill Of Quantities
19
False.
abdomen
The home row is the main section of a keyboard, it is the middle row of the keyboard.