answersLogoWhite

0


Best Answer

Planning involves forward thinking and anticipating possible future problems. It depends on the project you are planning what other considerations you need to take into account.

User Avatar

Wiki User

9y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What considerations must be made in planning process?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Management

What is the last step in the backward planning process?

determine when you must begin.


What are the main aims of the processes in the Planning process group?

-Determine the actions that must be taken to meet project objectives -Refine project objectives -Defing project scope


Planning is the thinking process and managers being a men of action should have no use for it comment?

Being of no use to the managers is one of the limitations of the planning process. The space among where the firm is and where they aspire to go may be closed with the help of planning. Making decisions regarding the future in the present is planning. It refers to what must be done, how it must be done when it must be done, and by whom. Managers frequently avoid planning because it is seen of as a significant, time-consuming, expensive, and laborious mental exercise. It requires careful consideration, a tonne of paperwork, and a lot of time. The majority of managers do not enjoy engaging in such challenging and difficult mental efforts that may or may not result in outcomes. Managers typically favour action over contemplation. As men of action, managers shouldn't employ planning since it involves thinking.


Explain why the process of project planning is iterative and why a plan must be continually reviewed during software project?

The 2 questions are not related to each other: - Iterative Project Planning is used when uncertainty is high. - The second part of the question probably should be edited out.


What is primacy of planning?

The principle known as Primacy of Planning states that planning must occur before other management functions can take place.

Related questions

What is the last step in the backward planning process?

determine when you must begin.


What are some considerations of a business planning to get renters insurance?

Business renters insurance is a necessary expense if the building a company occupies is not owned. Some of the considerations a business must plan on are fire and theft, liability and "Acts of God".


What are the considerations must be made when examining the boiling point?

The altitude at which you are making measurements must be considered when examining the boiling point.


What safety considerations must be taken into account when shampooing and conditioning?

what are the safety considerations that must be be taken into accountwhen shampooing and condition hair


What is material requirements planning?

Material requirement planning is the process of identifying and procuring the materials needed to make products. Businesses must do this in order to continue operations.


Do special considerations need to be made regarding the care of the mice?

Yes; all animals kept in a lab must be properly cared for.


PR must be integrated into the six phases of the force projection planning process?

Front leaning rest position, MOVE!


What are the considerations that a gaming entertainment property must take into account when determining room rates for convention groups?

There r no considerations


What are the inputs to Inputs to Performing Quality Assurance?

The inputs to the quality assurance process are:Output from quality planning - The following output items from the quality planning process become the input to the quality assurance process:• Quality management plan - This plan is the output of the quality planning process, and it describes how QA will be performed for this project.• Quality metrics - A quality metric is an operational criterion that defines in specific terms what something (such as a characteristic or a feature) is and how the quality control process measures it. The quality metrics developed during quality planning, such as defect density, failure rates, reliability, and test coverage, must be employed during QA.• Process improvement plan - The process improvement plan, helps improve the quality of the project and must be implemented during QA.


Why must e-business consider strategic planning to be a cyclical process?

It allows business decision makers to evaluate and react to the success of past decisions.


What is design constraints?

Constraints are things that the design of the particular object MUST have and they must be included in the final design. Considerations are things that should be thought about in the design process and may or may not be included in the final design


Are there any restrictions when building a modular garage?

Depending on where the garage is to be constructed, building permits may be required. There may be zoning restrictions about the use of the garage, the footprint of the garage, the materials, design, etc. The planning phase must include all of these considerations.