It describes a state that is only active in areas where there is no market based solution possible, because the goods in question are "public goods" and thus by definition cannot be provided through a market mechanism. The best example is the military being organized by the state. It should be noted that the residual state is an Ideal type and does not exist in its pure form.
Risk that remains after all controls have been selected
Risk that remains after all controls have been selected
It is the possibility of a remaining risk when all other risks have been eliminated
The point lies 1 unit below the regression line.
Risk that remains after all controls have been identified and selected.
Residual Powers are powers that the State have complete control over. Concurrent Powers are shared amongst the State and the Commonwealth, but where there is conflict the Commonwealth will prevail. Exclusive Powers are powers that only the Commonwealth have control over.
Residual deficits is a term used in the medical field. It refers to leftover issues that occur due to a condition. For example, after a stroke, one may have residual deficits that prohibit certain movements.
Minimal residual hepatic parenchyma means there's not much functional liver left.
Residual point
residual (powers)
In simple terms - 'residual risk' is the tiny possibility of something going wrong with whatever you're doing. For example, fell-walking is perfectly safe, however - there is a residual risk of you tripping or falling.
A residual risk is the remains of a risk on which a response has been performed. As part of CRM, you are managing some risk, for which you will have some risk response or strategy. A residual risk is the reminder of the risk that remains after you have implemented a risk response.
Risk that remains after all controls have been selected
Risk that remains after all controls have been selected
The point lies one unit above the regression line.
A residual What_does_residual_risk_mean_in_the_CRM_processis the remains of a risk on which a response has been performed.As part of CRM you are managing some risk, for which you will have some risk response or strategy. A residual risk is the reminder of the risk that remains after you have implemented a risk responseRead more: What_does_residual_risk_mean_in_the_CRM_process
For rock, the basic friction angle is somewhat less than residual angle. The basic friction strength is that shear resiatance of two smooth surfaces. The residual shear atrength is that for two rough surfaces after long shearing. At residual state, the shear resistance almost keeps constant and no shear-dilation.