Severity, Exposure, and Probability.
severity, exposure, and probability
reduction
Identity hazards
Residual risk is determined after you reassess the hazards as if the controls were in place.
The risk for a hazard before controls are put in place
Hazards pose a very high risk to a mission.
Use the highest residual risk of all the identified hazards.
high risk
Estimate the probability and severity and then determine the risk level using the risk assessment matrix
Estimate the probability and severity and then determine the risk level using the risk assessment matrix
real time risk management is used for?
real time risk management is used for?
reduction
reduction
Identifying hazards and controlling riskIdentifying hazards and controlling riskIdentifying hazards and controlling riskIdentifying hazards and controlling risk
in assessing hazards which elements make up the cross matrix comparison to determine a risk level