Want this question answered?
It takes power to do any kind of work.
If a load takes 50 kW at a power factor of 0.5 lagging calculate the apparent power and reactive power Answer: Apparent power = Active power / Power Factor In this case, Active power = 50 kW and power factor = 0.5 So Apparent power = 50/0.5 = 100 KVA
I don't know which one it is a ,current spiking,,,,,,impedance matching,,,,,latent heat,,,,,,power factor
A substation is not a load but is a place where switching and voltage-level changing takes place. Accordingly, you cannot apply a 'power factor' to a substation.
Time It takes To Build Peaking Power PlantIt typically takes one to three years to build a gas turbine power plant depending on the size and complexity. A 100 MW conventional gas turbine may take about a year. A 300 MW combined cycle power plant may take about two to three years. These estimates may increase if demand for gas turbines is high.
Born into power, marries into power, takes power by force.
The person who takes power illegaly in Greece is the tyrant!
Geothermal power stations are built by digging into the Earth's crust and tapping into the direct heat that is never ending. It generally takes around nine months to start a geothermal power station.
It takes power to do any kind of work.
If a load takes 50 kW at a power factor of 0.5 lagging calculate the apparent power and reactive power Answer: Apparent power = Active power / Power Factor In this case, Active power = 50 kW and power factor = 0.5 So Apparent power = 50/0.5 = 100 KVA
It has low resistance so takes more current.. hence the power
In a nuclear power plant, fission takes place in the core.
- 1 to the power 2 = 1 and to the power 3 takes you back to -1.
Whatever takes over when the main power supply fails.
Solar power Takes energy from phtons emmitted from the sun. Hydro power Takes power from currents of water turning a turbine. Nuclear power Splits atoms to release energy
power boat
power boat