answersLogoWhite

0


Best Answer

cmmi is is an integrated model for system, software, supplier sourcing and ippd. but cmm have separate model for all these things

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is Difference between CMM and CMMI?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is sei cmm and explain it?

SEI is the Software Engineering Institute. CMM stands for Capability Maturity Model. CMM has been replaced by CMMI (Capability Maturity Model Integration). For full details, go to http://www.sei.cmu.edu/cmmi/faq/comp-faq.html.


A List of CMM-5 Certified Companies in Philippines?

Azeus is CMMI Level 5 Headstrong is CMMI Level 3


Is century link a cmm level 5 company?

CMMI level3


Is mphasis cmm level 5 company?

s.. SEI CMMi level 5


What is the CMM level of Qwest software services?

CMMI Level 3 as of April, 2011


Is ITC infotech a CMMI level 5 company?

No currently it is not a Cmm level 5 Compnay


How does wipro acquire cmmi level 5 certification?

Audit your firm for acquiring CMM level.


What is the difference or relation between application of iso and cmmi?

CMMi means Capability Maturity Model Integration


Is JLT comes under CMM level Companies?

Yes JLT (Jardine Lloyd Thompson) is a CMMi Level certified organisation.


What is the cmm level for Assurgent Technology Solutions Pvt Ltd?

dont ask abt cmmi level...this company just established in 2005.it doesn't have any cmmi level.this company still not ISO certified also.its ISO certification is going on.


What is the difference between Boeing cmm and ohm manual?

There is no difference. They are the same manual but different companies use different titles.


Is SEI CMM Level 5 still Valid certification?

Often called "the CMM," the Software CMM was the first capability maturity model. It was adopted by organizations worldwide, primarily by software development companies. The Capability Maturity Model for Software (also known as the CMM and SW-CMM) has been retired, and CMMI (Capability Maturity Model Integration) replaces it. The SEI no longer maintains the SW-CMM model, its associated appraisal methods, or training materials, nor does the SEI offer SW-CMM training. All SW-CMM appraisal results from CBA IPI and SCE appraisals expired on December 31, 2007. After December 31, 2007, all SW-CMM ratings will be considered invalid and should not be advertised.