Section 34 of the Indian Penal Code provides for the liability of a criminal act done by several persons in furtherance of a common intention. Section 149 deals with the liability of members of an unlawful assembly for an offence committed in prosecution of the common object. Section 120B deals with criminal conspiracy, where two or more persons agree to commit an illegal act. For example, if five people plan and execute a robbery together, they may be charged under Section 34 IPC. If a group of people gather to attack someone and one of them kills the victim, all may be charged under Section 149 IPC. And if two persons conspire to commit a robbery, they may be charged under Section 120B IPC.
the ease off reeding and finding information faster
cmmi is is an integrated model for system, software, supplier sourcing and ippd. but cmm have separate model for all these things
There is no difference. They are the same manual but different companies use different titles.
AMM is a manual which deals with removal & installation of an aircraft component or LRU's. It does not give any information of O/H. This type of maintenance generally performed in line maintenance. CMM is a manual which deals with O/H of an any aircraft component and generally IPC used to attached with it & this maintenance is also known as shop maintenance
It is: cmm or CMM = 1900
It is 122.5 cmm (whatever cmm means).
There are many manuals used for aircraft maintenance such as the Aircraft Maintenance Manual (AMM), Illustrated Parts Catalogue (IPC), Structural Repair Manual (SRM) and the Component Maintenance Manual (CMM). The AMM shows you how to remove, refit and test a component but to overhaul or repair the item, you will need the CMM as it describes how to strip, inspect and repair each item.
currently its cmm level 3 and applied for cmm level 5
there are 511 sections in ipc ( indian penal code)
CMM level V
Obviously its CMM Level 5