There is no difference. They are the same manual but different companies use different titles.
cmmi is is an integrated model for system, software, supplier sourcing and ippd. but cmm have separate model for all these things
Component Maintenance Manual
An Aircraft Maintenance Manual (AMM) provides comprehensive instructions for the maintenance, inspection, and repair of an aircraft, detailing procedures for various systems and components. In contrast, a Component Maintenance Manual (CMM) focuses specifically on the maintenance and repair of individual components or parts of the aircraft, offering detailed guidance on disassembly, inspection, and reassembly. While the AMM covers the overall aircraft maintenance, the CMM is more specialized and targeted at specific components.
AMM is a manual which deals with removal & installation of an aircraft component or LRU's. It does not give any information of O/H. This type of maintenance generally performed in line maintenance. CMM is a manual which deals with O/H of an any aircraft component and generally IPC used to attached with it & this maintenance is also known as shop maintenance
It is: cmm or CMM = 1900
There are many manuals used for aircraft maintenance such as the Aircraft Maintenance Manual (AMM), Illustrated Parts Catalogue (IPC), Structural Repair Manual (SRM) and the Component Maintenance Manual (CMM). The AMM shows you how to remove, refit and test a component but to overhaul or repair the item, you will need the CMM as it describes how to strip, inspect and repair each item.
It is 122.5 cmm (whatever cmm means).
currently its cmm level 3 and applied for cmm level 5
CMM (Capability Maturity Model) is a framework for assessing and improving an organization's processes, primarily in software development, by defining maturity levels from initial to optimized. In contrast, IPC (Inter-Process Communication) refers to mechanisms that allow processes to communicate and synchronize their actions in a multitasking environment. While CMM focuses on organizational process improvement, IPC is concerned with the technical aspect of enabling processes to exchange data and coordinate execution.
CMM level V
Obviously its CMM Level 5
list of cmm level 3 company