Want this question answered?
The reorder point indicates when to place an order. The reorder point is calculated by 1) estimating the sales in the near future, 2) estimating the number of days between ordering and receiving the additional units, and 3) the number of units of safety stock. Check Ordering online
yes.they have the maximum number of electrons in their outer energy level?
1s orbital 3P, 5d, and 7f in discovered elements
No. Maximum of 18 electrons is possible in third energy level.
8
) Reorder Level - Maximum Consumption x Reorder Period Reorder Period = is the amount of time from the point at which you determine the need to order to the point at which the inventory is on hand and available for use But Re Reorder Quantity is - How much quantity to be ordered when stock reached below reorder level - Anurag
Level of stock at which order is made for new stock.
Reorder point is deals with the specific time in which you should place an order with your supplier. Reorder level is the specific quantity that you should have on hand when your order is placed.
Maximum stock level is the maximum amount of stock you should maintain to avoid depletion of quality and un-necessary carrying costs.It is calculated as follows RE-ORDER LEVEL + RE-ORDER QUANTITY - (MINIMUM CONSUMPTION x MINIMUM PERIOD OF DELIVERY.
what is the difference between Re oreder level and EOQ
An inventory system can improves a retailer's ability to make sure there is a constant inventory on hand. Without an inventory system a retailer really has no way to know when to reorder stock. Many systems will notify the owner when to reorder stock items.
Reorder the letters according to the color: "What is my name in capitals"
The reorder point indicates when to place an order. The reorder point is calculated by 1) estimating the sales in the near future, 2) estimating the number of days between ordering and receiving the additional units, and 3) the number of units of safety stock. Check Ordering online
reorder
It depends on your current stock level and stock turnover.
re-order point/level = daily demand * lead time= (Annual Demend/Operation Day) * lead time
what does the term reorder mean in math