The master production schedule “drives” the system. It states the planned due dates for end items. Material requirements planning computer runs, however, involve an iterative process. The master production schedule “proposes” or “hypothesizes” a tentative schedule. After the MRP run with this schedule, the shop scheduler examines the MRP plan for impractical loads on the productive system—either by stating excessive demands on personnel or equipment, or in excessive idle time. Then the master production schedule is revised and the program is run again.
Master Production Schedule or MPS is the production plan company establishes for specific fiscal year for producing goods as well as for inventory, staffing etc to meet the required sales demand for specific period.
true
matching output to customer demand
production budget
The Production Budget for The Master was $37,500,000.
Materials resource planning (MRP) is a system that uses bill-of-material, current inventory levels, expected receipts of inventory, and a master production schedule to determine material requirements. When MRP is used correctly a manufacturing company will have the right inventory on hand at the correct time to ensure the master production schedule will be fulfilled.
The aggregate plan balances the Plant's capacity with demand and the MPS translates this plan into numbers of specific products in time frames.
Production department is transform input into output.
Total yield in a unit in a unit input. Graphically the production yield can be plotted against the unit input to determine the production yield at any point.