The site should have enough capacity to hold water for desired number of years. It should also have some source of water inlet.
selection of site for the dam : It must satisfied geological condition.
The site should have enough capacity to hold water for desired number of years. It should also have some source of water inlet.
supports strategic direction on selection criteria?
well, first of all we have two major criteria that these two have some other criteria related that we name it sub criteria two main criteria are Socio-economic criteria and Environmental criteria subcirteria for Socio-economic criteria are accessibility to roads nad trade center of city and so on. subcirteria for Environmental criteria are slop, height and .... each of these have maps to overlay with each other
Selection criteria are the job-specific skills, personal qualities, desirable qualifications, knowledge and experience that the selection panel believe are needed to perform the duties of the advertised position successfully. Applicants are assessed against these criteria to determine their merit for the position. The main purpose of selection criteria is to create a level playing field for all prospective applicants so that each applicant is given the same opportunity to apply for the job. Selection panels use selection criteria to shortlist written applications for interviews.
Site of Old Croton Dam was created in 1842.
Some of the selection criteria for a successful tender includes: the fitness for purpose,maintenance and running costs,risks and warranty.
It is where the Colorado River was at and it was an excellent dam site.
Having a can-do attitude for selection criteria involves showcasing enthusiasm, a willingness to learn and grow, a proactive approach to challenges, and a positive mindset towards meeting all the requirements set forth in the selection criteria. This attitude can demonstrate to the selection committee that you are motivated, adaptable, and committed to excelling in the position.
It is where the Colorado River was at and it was an excellent dam site.
The selection criteria for relief valves is based on a number of factors. Some of them include size, design and the operating characteristics among others.Ê
When a dam is to be built, a diversion tunnel is usually bored through solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows through the diversion tunnel.