answersLogoWhite

0

Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.

What else can I help you with?

Related Questions

What is cut-off level in pile foundation?

Piles are used in foundations to give a better base for structures. The appropriate pile cut-off level is commonly around 75mm above the underneath of the pile cap.


What is a stepped foundation and what it is it used for?

A stepped foundation is a type of foundation made from "cement", it is used when building on a hillside so that the building can be built up level off the foundations


How do you repair a carpet burn?

depending on how bad the burn is, you can try using a razor blade and just cut the top of the pile off the carpet. If its deep, you can cut it out, pulol the carpet off the tack strip at the end of a run, cut a small piece and glue it to the damaged section


Who pays for the hair cut for Locks of Love?

You do. you pay for the actual hair cut, and if the hair you cut off is long enough (im not sure how long) then you can donate it to the foundation, locks of love.


What are parts of a dam?

Spillays power house core of dam shells cut-off trench cutt off srainage system upstream blanket foundation


What is a tilt switch?

A tilt switch is commonly used at the end of a conveyor system. Where product is dropping off the conveyor and into a pile, the pile height can be governed by the tilt switch. The switch is a vertical device that hangs at a level that the conveyor should be shut off at. When the pile pushes the tilt switch 5 degrees out of plumb a mercury switch inside the tilt switch operates and shuts off the motor to the conveyor.


What is the cut off level for cocaine?

That makes no sense to me. Levels of what? For what?


Will oil level sensor make your car cut off in a 1995 Chevrolet caprice?

No it will not.


When you cut your car off a boiling sound is coming from top radiator hose?

Check fluid level WHEN IT cools off.


In scientific method An hypothesis is accepted when it is above the cut-off value and it is rejected when it is below the cut-off value. If our statistical analysis shows that the significance level i?

If the statistical analysis shows that the significance level is below the predetermined alpha level (cut-off value), then the hypothesis is rejected. This suggests that there is enough evidence to believe that the results are not due to random chance. If the significance level is above the alpha level, then the hypothesis is accepted, indicating that the results are not statistically significant and may be due to random variation.


What is cut off mark for the year 2013 in the BE entrance exam?

The cut off mark for 2013 in the BE entrance exam will be based upon the difficulty level of the exam and the number of seats under the exam. This is no exact cut off mark noted for 2013 yet.


What is the difference between makeup foundation and powder?

The difference is foundation is what you put on after concealer. Now concealer is what covers up blemishes and dark circles. And then the powder is to finish it off and give it a nice clean cut look:)