under reamed piles
B/3
Footings will differ based upon the type of project. Most footings, if building a deck for example, should be about six feet apart.
A structure need a foundation that supports it. If the structure is built on a soil that has bearing capacity which can withstand the weight of the whole structure, then you can design the foundation on footings alone. But if the soil is WEAK, you need piles to penetrate further the soil to have greater bearing strength.
It is a foot to the second power
Timber piles, Concrete piles, steel piles, composite piles,Driven cast in situ piles, Bored cast in situ piles, Driven precast piles, Bored precast piles,Prestressed concrete piles, under reamed Piles
Isolated footings are constructed invidually & Mat foundation is making of mat and connecting all footings with this mat
It is recommended that footings in the Wisconsin area be 48" for most buildings. This is because of the deep frost that can occur in harsh Wisconsin winters.
Footings, the concrete pads upon which foundation walls are built, must be located beneath the frost line in order to prevent a building from heaving when the ground freezes. If the site is sloped maintaining a constant elevation for the footings would either cause the footings to be above the frost line or significantly deeper than the frost line at one end of the building. Stepping the footings enables them to follow the slope of the site and remain below the frost line without going too deep under the ground. It allows the foundation wall heights to be minimized because the footings are kept as close to the surface as possible.
Piles is not infectious.
Piles of poo Piles of poo Piles of poo Piles of poo
Nine piles of sand.