answersLogoWhite

0

Material requirement planning is the process of identifying and procuring the materials needed to make products. Businesses must do this in order to continue operations.

What else can I help you with?

Related Questions

What has the author George W Plossl written?

George W. Plossl has written: 'Getting the most from forecasts' 'The master production schedule' 'The role of top management in the control of inventory' -- subject(s): Industrial management, Inventory control 'The best investment-control, not machinery' 'Effective corporate strategy in manufacturing' -- subject(s): Production management 'Material requirements planning and inventory record accuracy' 'Material requirements planning by computer' -- subject(s): Data processing, Inventory control, Material requirements planning, Production control


Each of these are ways of incorporating classified source material into new material except?

Planning


What does mrp stand for?

MRP is an abbreviation used for many different things. Some things include manufacturing resource planning, marginal revenue product, material requirements planning, and maximum retail price.


What is a mrp system used for?

An MRP or Material Requirements Planning system is system that is used for inventory control and production planning. This is used in the manufacturing process and most of these systems are software based. MRP can also be conducted by hand.


Who will major construction requirements that require detailed planning will be sent to?

planning section


What is the difference between material requirement planning and manufacturing resource planning?

Material Requirement Planning specifically define the requirments of dependent requirements of materials only base on forecast/ projection/ safety stock/ kanban/ pull system or scheduled/ planned production base on historical data/ push system. Manufacturing resource planning on the other hand would include all aspect of resources that would impact the over all manufacturing planing process which include: machinery, labor, set up, raw material, ect....


What planning requirements are identified for situations considered dangerous or like to occur and for which advance planning would be prudent?

Crisis Planning


What are planning requirements identified for situations considered dangerous or likely to occur and for which advance planning would be prudent?

Crisis Planning


What has the author Sunuk Kim written?

Sunuk Kim has written: 'Schedule-based material requirements planning' -- subject(s): Data processing, Production scheduling, Inventory control, Production control


What are ways of incorporating classified source material into new material?

Paraphrasing/Restating, Extracting, Generating. Planning, on the otherhand, is not a way to incorporate classified source material into new material.


What is discrepant material?

Discrepant material is material or product that does not meet specified requirements (also called non-conforming material).


What are the answers to IS 235 emergency planning?

in the study material