answersLogoWhite

0

The Civil Engineering Data Standards manual states the density of many grades of concrete. Standard density for fresh M-25 concrete is: 2414 Kg/ M3.

User Avatar

Mary Runte

Lvl 10
2y ago

What else can I help you with?

Related Questions

What is the density of reinforced concrete grade 40?

The density of reinforced concrete is 2500 kg/cum or 25 kn/cum


What is the density of M-25 grade concrete?

The Civil Engineering Data Standards manual states the density of many grades of concrete. Standard density for fresh M-25 concrete is: 2414 Kg/ M3.


What is the density of M-30 grade concrete?

Density of M30 and any fresh concrete is 2400kg/cu.m and reinforced concrete density you can take 2500 kg/cu.m


What is the density of M-40 grade concrete?

2503.4


What is the tonnes of sand required in one cubic metre of grade 25 concrete?

In grade 25 concrete, which typically has a mix ratio of 1:1:2 (cement:sand:aggregate), approximately 0.5 cubic metres of sand is required per cubic metre of concrete. Since the density of sand is about 1,600 kg per cubic metre, this translates to around 800 kg of sand needed for one cubic metre of grade 25 concrete. This amount can vary slightly based on the specific mix design and moisture content of the sand.


What is the ratio for grade 25 concrete?

1:1:2


What is a development length and how to calculate for M30 grade concrete and Fe500 grade steel?

M 25


What is proportion of M 25 grade concrete?

1:1:2


What is the ratio of cement and sand and crushed stone in mix concrete of M-25?

The ratio of cement, sand and crushed stone in M 25 grade concrete is 1:1:2.In this grade of concrete a compressive strength not less than 25 N/mm2 is achieved in 28 days.


What is consumption of cement in M25 grade concrete?

cement consumption in M-25


Different grades of cement and their applications?

in a simple way it is the strength of concrete, which it can bear the loads of its specified grade ex C 25 grade can resist the weight of 25kn/m2 after 28days of 60% after 7 days.


What grade of concrete use in column and slab?

as per ACI , the ratio between column & beam concrete grades dont exceed 1.4