60000 + 30000 = 90000 = 60% / 60 = 1500 = 1% x 100 = 150000 = 100% X .4 = 60000
The above solution is incorrect. By definition, the conversion cost is the sum of the direct labor cost and the overhead. Therefore, if we assume x is the conversion cost, then x = 0.4x + 60,000. The solution is conversion cost = 100,000. Hence, the direct labor cost = 40,000. Note that the knowing the direct material cost is not necessary for the computation of the labor cost. I am really bad at math so i just have to think you are right on this one
Manufacturing Overheads = 20% of Conversion CostTotal Conversion Cost = ?Total Conversion Cost = Direct Labor + Manufacturing Overheads100% = 80% + 20%Total Conversion Cost = direct labor * 100/80Direct labor = 38000Total Conversion Cost = 38000 * 100/80Total Conversion Cost = 47500Manufacturing Cost = Total Conversion Cost - Direct LaborManufacturing Cost = 47500 - 38000Manufactruring Cost = 9500
false, direct labor and manufacturing overhead = conversion cost
Yes conversion cost is sum of direct labor and overheads which required to run the process of production of units.
The price variance might result from use of cheaper but inferior quality materials hence though it will be cheaper , the final product will be compromised .
The predetermined overhead rate used to apply overhead to finished jobs is determined before the period begins.
No, Conversion cost is the sum of direct labor cost and manufacturing overhead cost.
Pricing is based on direct labor and overhead. Materials does not affect pricing. Example: Your customer provides materials used in production.
Manufacturing Overheads = 20% of Conversion CostTotal Conversion Cost = ?Total Conversion Cost = Direct Labor + Manufacturing Overheads100% = 80% + 20%Total Conversion Cost = direct labor * 100/80Direct labor = 38000Total Conversion Cost = 38000 * 100/80Total Conversion Cost = 47500Manufacturing Cost = Total Conversion Cost - Direct LaborManufacturing Cost = 47500 - 38000Manufactruring Cost = 9500
Conversion Cost (CC) = Direct Labour (DL) + Manufacturing Overhead (MO) CC = 35000 + (35000/40)*60 Therefor, M0 = (35000/40)*60 = 52500
false, direct labor and manufacturing overhead = conversion cost
No. Cost would include the cost of materials. Overhead would not.
20
yes A cost that attaches to the physical units is termed a product cost. Product costs would include direct materials, direct manufacturing labor, and manufacturing overhead. Conversion cost is the cost involved in converting the direct materials into a finished product. It is composed of direct manufacturing labor and manufacturing overhead. Any cost that does not attach to the physical units would be termed a period cost and would be expensed as incurred. Therefore, a cost is either a period or a product cost. Electricity cost, whether variable or fixed, would be included in manufacturing overhead and classified as conversion costs, and therefore cannot be classified as a period cost.
If the estimated materials, labor or overhead costs allocated for a manufacturing order is different from the actual cost of the MO then the potential result is a Manufacturing Overhead Variance.
Total Manufacturing Cost = Direct Material + Direct Labor + Factory Overheads Prime Cost = Direct material + Direct Labor Conversion Cost = Direct Labor + Factory Overhead So yes prime cost and conversion cost is equal to total manufacturing cost
Total Manufacturing Cost
Yes conversion cost is sum of direct labor and overheads which required to run the process of production of units.