answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the incorrect when performing overhead work?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Accounting

The entry to allocate manufacturing overhead costs to work in process requires a debit to work in process inventory?

Assume you have manufacturing overhead 5,000Journal Entry would be:Dr. Work in Process ---------5,000Cr. Manufacturing Overhead ----------5,000


Applied overhead vs actual overhead?

APPLIED Overhead is computed using the predetermined overhead rate and is the amount of costs applied (or estimated) to be allocated (needed) for specific jobs. ACTUAL Overhead is found after the manufacturing process is complete which gives the actual amount of used/consumed resources (or total costs) that it needed to complete the job. The two amounts can then be compared afterward which is known as Under- or Overapplied Manufacturing Overhead. When Manufacturing Overhead has a DEBIT balance, overhead is said to be UNDERAPPLIED, meaning that the overhead applied to work in process or to the certain job is LESS than the overhead incurred. On the contrary, when manufacturing overhead has a CREDIT balance, overhead is OVERAPPLIED, meaning that the overhead assigned to work in process or to the certain job is GREATER than the overhead incurred.


How do you work an overhead application backwards?

The Towson Manufacturing Corporation applies overhead on the basis of machine hours. The following divisional information is presented for your review:Division ADivision BActual machine hours22,500?Estimated machine hours Overhead application: Working backward20,000?Overhead application rate$4.50$5.00Actual overhead$110,000?Estimated overhead?$90,000Applied overhead?$86,000Over- (under-) applied overhead?$6,500Find the unknowns for each of the divisions.


How do you do the double entry for work in progress?

[Debit] Work in process [Credit] Material [Credit] Labor [Credit] Overhead


What is combined overhead variance?

Combined overhead variance = fixed overhead variance + variable overhead varianceFixed Overhead :which remains fixed and donot change upto certain level of productionVariable Overhead: which keep changing with the change in production units.

Related questions

Does an athlete do work on a trophy as she lifts it overhead?

Yes she does


What is CPU overhead?

When CPU is used with full capacity, so the system slows down. (The answer may be incorrect, delete this if not.)


The entry to allocate manufacturing overhead costs to work in process requires a debit to work in process inventory?

Assume you have manufacturing overhead 5,000Journal Entry would be:Dr. Work in Process ---------5,000Cr. Manufacturing Overhead ----------5,000


Applied overhead vs actual overhead?

APPLIED Overhead is computed using the predetermined overhead rate and is the amount of costs applied (or estimated) to be allocated (needed) for specific jobs. ACTUAL Overhead is found after the manufacturing process is complete which gives the actual amount of used/consumed resources (or total costs) that it needed to complete the job. The two amounts can then be compared afterward which is known as Under- or Overapplied Manufacturing Overhead. When Manufacturing Overhead has a DEBIT balance, overhead is said to be UNDERAPPLIED, meaning that the overhead applied to work in process or to the certain job is LESS than the overhead incurred. On the contrary, when manufacturing overhead has a CREDIT balance, overhead is OVERAPPLIED, meaning that the overhead assigned to work in process or to the certain job is GREATER than the overhead incurred.


How do you change timing belt on a duel overhead cam in a 1996 Mazda MX6?

If your asking this question than you shouldn't be performing this job yourself<


What is the work of Clerk?

work in office performing as keeping records


How do overhead bridge cranes work?

Like the regular joints


Can a single overhead head for a 1992 Mazda protege work can on a double overhead block for a 1992 Mazda protege?

DONT BE STUPID


What is the valve clearance for Isuzu 5.2l diesel?

Engine needs to be cold when performing overhead adjustment. Spencer's is .16" intake and exhaust valves closed.


How do you work an overhead application backwards?

The Towson Manufacturing Corporation applies overhead on the basis of machine hours. The following divisional information is presented for your review:Division ADivision BActual machine hours22,500?Estimated machine hours Overhead application: Working backward20,000?Overhead application rate$4.50$5.00Actual overhead$110,000?Estimated overhead?$90,000Applied overhead?$86,000Over- (under-) applied overhead?$6,500Find the unknowns for each of the divisions.


When manufacturing overhead is applied to production is added to?

the Work in Process account


What are making copies selling their work publicly performing and displaying their work?

DEESNUTS