answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the inverse of the time required for a wave to complete one full cycle is called?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How is the time required for one cycle a complete motion that returns to its starting point is called the?

period


Is frequency the time required for one complete cycle?

Frequency is 1 divided by the time required for each cycle.


The time required for one complete wave cycle?

period.


What is one complete heartbeat called?

The cardiac cycle.


What is the cycle time of construction equipment?

The period required to complete one cycle of an operation or to complete a function, job, or task from start to finish. Cycle time is used in differentiating total duration of a process from its run time


The length of time between a point in one cycle and the same point in the next cycle of an ac wave is the?

this is called time period of the wave. it is also the inverse of frequency of wave.


Each complete heart beat is called what?

cardiac cycle


How much time is required to complete one cycle if the frequency is 120 Hz?

1/120 seconds!


The complete process which is needed to produce ATP is called the?

Krebs cycle


How many rotations of the crankshaft are required to complete each stroke of a two stroke cycle engine?

one rotation


The complete breakdown of one molecule of pyruvic acid is called what?

the krebs cycle


Forming cycle?

The time required to complete the injection molding process is called the molding cycle, also known as the molding cycle.The molding cycle directly affects labor productivity and equipment utilization, so the production process should be on the premise of ensuring quality, as far as possible to shorten the injection molding cycle at each relevant time.