answersLogoWhite

0


Best Answer

The most likely cause for any type of line protocol being down is that a network administrator used the shutdown command on these lines to prohibit access to telnet, ssh and connection to the line con 0.

User Avatar

Wiki User

8y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the most likely cause for the line protocol being down?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Which command output would you most likely see if you had a problem at the physical layer?

Ethernet 0/0 is down, line protocol is down


Which command output would you most likely see if you had a problem at the data link layer?

Serial 0/1 is up, line protocol is down


What are the risks of being 35 and pregnant?

down's syndrome is more likely


What storm is most likely to cause quick destruction down a narrow path?

A tornado


Does smoking weed upside down get you higher?

It will likely cause you to pass out resulting in extreme injury.


Line protocol in down then what you do?

there may be the issue with the layer 2 protocol like hdlc or ppp is not configured or wrongly configured if the interface is serial interface.


Why is your 2001 pt cruiser overheating in idle but when you drive it cools down?

The most likely cause is a failed radiator fan.


If a guy comes on his hand and puts it at your waist can it leak down to the vaginal area and cause pregnancy?

It is possible I suppose but not likely.


What is the cause of the temperature gauge of a 1995 Dodge Neon to always go up and down?

The relay sensor is likely defective


What is likely to be the cause of a loud squealing noise when you put your foot down on the clutch?

throw-out bearing going bad is my guess


What would cause your radio to come on but no sound?

The most likely reasons are the volume is turned down or the radio is not tuned to a station.


What are the disadvantages of field trip as a teaching strategy?

Some disadvantages of using field trips as a teaching strategy include logistical challenges such as transportation and coordinating schedules, potential safety concerns for students outside of the classroom environment, and the potential for distraction or lack of focus during the trip. Additionally, field trips may not always align perfectly with the curriculum or learning objectives, leading to a potential disconnect between the experience and the desired educational outcomes.