answersLogoWhite

0

At Khidirpur near Kolkata Dock. This bridge can be folded and opened to allow passage of ships

User Avatar

Wiki User

11y ago

What else can I help you with?

Related Questions

What is the feature of fixed movable bridge?

You can't have a "fixed" "movable" bridge, the two terms are contradictory.


Where is the Howrah Bridge located?

Kolkata


What is known as the gateway of kolkata?

howrah bridge


Where is the movable bridge most commonly used?

hghg


What is the distance between howra station and kolkata city?

The distance between Howrah Station and Kolkata city is less than 1 km. Howrah & Kolkata are separated by the Hooghly River (Ganga) and connected by the Howrah Bridge. The Howrah Bridge is 705 metres long.The bridge is renamed Rabindra Setu by the Bengalis (the Bengali poet / artist had nothing to do with the bridge).This bridge is one of the finest cantilever bridges in the world - left to India by the British engineers.


What is the name of India largest rail bridge?

At present the Nehru Setu Bridge near Dehri on the river Sone is the largest rail bridge in India and this bridge is near Sasaram on Kolkata-Delhi Line. It is 3.065km long and has 93 spans of 30.5m each.


Why did they build Howrah bridge?

Howrah bridge was built to link the two cities of Howrah and Kolkata (Calcutta). Refer to link below for more information.


Which is more economical for movable support system and bridge girder launcher?

Definition from China ZZHZ company Movable support system is a kind of construction machinery to install bridge girders by way of cast-in-place with its own formwork, supported by box girder. Bridge girder launcher realizes bridge construction if the girder carrier transports the prefabricated concrete girder to the rear part of the launcher. Difference between movable support system and bridge girder launcher 1. Without prefabricating concrete girder in the precast girder yard, the movable support system adopts cast-in-place and field maintenance. Averagely it finishes one piece of girder every 12 days. While for the bridge girder launcher, it needs to prefabricate concrete girder, then transport them to be installed on the bridge floor 2. The movable support system has a longer cycle to finish the project but with low investment and high benefit; the bridge girder launcher with a short completion time but high investment 3. With low investment and short preparation time, the movable support system can be fast put into use. While the bridge girder launcher needs a long time to prepare for other equipments such as girder carrier and gantry crane. 4. With less land occupation, the material cost of the movable support system is relatively low. 5. The movable support system is widely used in the mountain area that can not build large-sized precast girder yard, while the bridge girder launcher is popular in large-sized precast girder yard To sum up, it depends on the practical situation. But generally, the movable support system is more economical and more suitable for constrictive economy environment at present and in the future.


Which is the longest road bridge in karnataka?

P.V. Expressway in Hyderabad (11,600 metres)


How can you make a bascule bridge?

well since its a bascule bridge you can use mini motors. connect the mini motors to a string and attach it so you can pull the leaf.


What are movable fin and movable exhausts use for?

What are movable fin and movable exhausts use for? [Improve]


What is the zip code kolkata?

There is no zip Codes in Kolkata there are all Pin Codes. Kolkata city pin code is 700001 Kolkata.