answersLogoWhite

0

Putney bridge

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

Why is it called The Bridge?

There are two theories. Firstly, because the bridge has a tower at both ends - and secondly, because the bridge is adjacent to the Tower of London.


Why did they call tower bridge tower bridge?

When I did History in High school, I think it was 8th grade, we did british history and we learnt that the tower of London was built by William the conquer, as his home, It was named because it was situated in London, and it was a large castle with a tower.


What is the meaning of the tower bridges name?

There are two possible answers. The bridge is immediately adjacent to the Tower of London so may have been named after it. Alternatively, there is a tower at both ends of the bridge to support the suspension cables so could have been called 'Tower' because of that.


What is the span of the tower bridge?

The span for a tower Bride is centre to centre distance between the pulleys at both ends of towers


Why are two ends of a long bridge set on rollers?

The rollers allow the bridge to expand and contract with changing temperatures without causing structural damage. This is important to prevent cracking or buckling of the bridge due to thermal expansion.


Why are the ends of many bridges not attached to bridges?

When you finally reach dry, flat land there is no need for a bridge. So many bridges are attached to roads and railways instead, often at both ends.


Where does the Betsy Ross bridge end?

The Betsy Ross Bridge ends in New Hampshire.


How do you send a fax from Vancouver to London?

You simply need the fax numbers of both ends of the fax. For example, the business in Vancouver should have a fax number, as should the business in London. Make sure to add the country code for London.


What bridge does the oxford and Cambridge boat race start?

Starts just after Putney Bridge and ends before Chiswick Bridge


From what bridge does the oxford and Cambridge boat race start?

Starts just after Putney Bridge and ends before Chiswick Bridge


What is difference between piers and abutments in bridge?

AbutmentA retaining wall supporting the ends of a bridge or viaduct.Pierssupport if continuous bridge


Explain the process and stages involved in building the harbor bridge?

The harbour bridge was built on Saturday 19th March 1932. The pylon is used to hold the bridge from both ends. Then the arc was made and used cranes to hold them up in place. The there was the road being made and then the cconcrete.