Want this question answered?
Portland cement (and the concrete, mortar, thin set, or other masonry product made from it) doesn't dry. Rather, it cures by a chemical reaction initiated by putting water in it. The reaction is irreversible; hence, adding water to cement is an irreversible change.
common sense..
A 94 lb bag of cement consists of 94 lbs of cement. I mean, isn't it obvious? The cement is used to make sidewalks, etc. They dry and is some of what we walk on today. :)
When water is added it starts a process beginning with the formation of short hexagonal crystals. it is this process of crystal formation which begins the setting process and usually is substantially complete after 24 hours. However, the crystals continue to form and fill up the spaces for weeks and even months as long as the cement is not allowed to dry out. When mixing cement it is recommended to keep it wet for at least 3 days, when it reaches maybe 80% of its final strength, but a week to ten days is better. Cement will continue to harden for several years. The strongest cement you can get is that which sets up underwater and is never allowed to dry out
no, it will weigh heavier because it will dry into cement when mixed with water and the weight of water will add to the weight of the concrete.
Mortar is sand cement and water mixed together . Once allowed to dry and set , holds your building blocks, bricks etc together .
If it looks sandy when dry you haven t added enough cement; the mixture will be weak.
On a human it is dry and flaky if u don't wash the soap out of your ears cause then it gets hard on your ear which makes it flaky.
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
No. Premixed Type S mortar contains lime, which will cause it to shrink and crack. Best to use Portland cement mixed with masonry sand and a small amount of water. Should be mixed to a nearly dry consistency and "dry-packed."
how long does roof cement to dry
one cubic meter is equivalent to 1000 cubic decimeters or 1000 liters. assuming the amount of mortar used has a volume of 2/3 of 1 brick (figuring on standard red brick of 2.5 x 5 x 10 inch bricks) per brick, then the amount of mortar used will be about 333 1/3 liters. if 1/3 of the volume of the mortar is water then the dry ingredients are equal to 222.222 liters. of that: 1/6 of the dry ingredients are portland cement if you are using a 3:2:1 (sand, lime, cement) or 37.04 liters.
Portland cement (and the concrete, mortar, thin set, or other masonry product made from it) doesn't dry. Rather, it cures by a chemical reaction initiated by putting water in it. The reaction is irreversible; hence, adding water to cement is an irreversible change.
Dry flaky skin may be the result of a change in humidity, or psoriasis. Try using lotion to treat it and talk to your doctor.
Dogs can get dry and flaky skin for reasons such as sub burn, allergic reaction, or flea bites.
There are two types of cement process,Dry processWet processThere are two types of cement processing,Dry processWet process
Lotions or creams with aloe