answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is the standard depth of a excavation for an isolated footing?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the equation for finding the volume of isolated footing?

In general an Isolated footing has three parts. One Rectangular part another is Trapizoidal part and rest is Pedestrial part. The volume of concrete of rectangular part if AXBXH. The concrete volume of Trapizoidal part is h/3( AXB + aXb+ Sqrt(AXBXaXb) where h= Thickness of Trapizoidal portion, A & B are the dimensions of Bottom face and a & b are the dimension of top face. The volume of Pedestrial portion is aXbXD where D id depth of Pedestrial portion. Sum of three calculation gives you the volume of concrete of Isolated footing.


What are the ratings and certificates for The King and I An In-Depth Excavation of Bubba Ho-tep with Director Don Coscarelli - 2005 V?

The King and I An In-Depth Excavation of Bubba Ho-tep with Director Don Coscarelli - 2005 V is rated/received certificates of: UK:12


What is the frost depth for Saskatchewan?

What is the frostline depth in saskatchewan Canada


What is the required depth of a frost footing In Red Hook NY Dutchess County?

3.5 to 4 ft


What is the standard of a stair depth according to residential code?

what is the standard depth of stairs


What is the minimum distance allowed near open trenches when travelling a crane and why?

The minimum distance is the depth of the excavation...


How do you use the word excavation in a sentence?

The excavation of the fossil was hard for the paleontologist.


How much does excavation cost?

It all depends on the size, how many hours, and general condition of the machine.


How many days after concrete casting should nitobond be used?

I am concreting a footing for 1m depth now and the balance .5 m depth after 3 days of first poured concrete.Should i use Nittobond


What is the difference between excavation and Trenching?

Excavation is the process of digging and removing materials from the ground, which can involve digging deep holes or removing large amounts of soil. Trenching specifically refers to the process of digging long, narrow ditches, typically used for laying pipes, cables, or other utilities underground. Excavation is a broader term that can include trenching as one of its methods.


What is the frost depth line in San Antonio Texas?

Best Answer is to contact the San Antonio City Office and ask the bulding inspector for the specific area you are interested in. They will be able to answer your question; I am guessing it is related to footing depth.


Is code for measurement in earth work excavation?

To measure earthwork excavation, you can use techniques such as grid surveying, cross-section method or 3D laser scanning. These methods will help you calculate the volume of material moved, ensuring accurate measurements for your project. Additionally, using a GPS system can help track the location and depth of excavation activities.