The term "tripping the well" got it's start most likely as a reference to the "round trip" made by the drill bit. The first leg of the trip is coming out of the hole, by lifting the entire drill string and unscrewing the upper most drill pipe called a joint, the newly removed drill pipe is laid beside the rig and the drill string is lifted again, etc. until all drill pipe is out of the hole. After service work is performed, for example change to fresh drill bit, then the second leg of the trip is to reverse the process, lowering the drill string as each new joint is made until fully back in the hole with the bit on bottom. You can find a lot of interesting videos on offshore rigs, jobs, etc here:
I left the previous answer in place:
When drill pipe is lowered or put into the well in the well, it is called running in or is tripping into the well. When drill pipe is raised or pull out of the well, it is call running out or tripping out of the well.
The catwalk is connected to the rig floor and is used to ease the movement of equipment between the rig floor and pipe deck.
Because a device in the pipe which collects the oil broke. The device is used for separating methane gas from oil since it was broken the methane hgas rushed up and the oil rig caught fire.
try and try again its hard been trying for 3 years
Hydraulic drill pipe tongs. They are available in tubular sizes 2-3/8" to 12 in".
The V-door is an opening at the floor level in one side of the derrick and is located on the rig floor opposite to the draw works. It is used as an entry point to bring in drill pipe, casing, and other tools from the pipe rack.
Oil rig oil Derick
when tripping pipe in the hole do you close elavaters before running them up to the derrikman
The catwalk is used to roll drill pipe, casing and tools from the ground level of the rig to the rig floor which can be from 5' to 30' or more depending on the type of rig. Once on the catwalk pipe or tools are pulled up the V-Door which connects the catwalk to the rig floor.
BP put a new cap on the leaking pipe, but, as of July 14, 2010; no one knows if it's working to stop most of the oil from escaping the leak.
I am looking for a job as a chef on an oil rig
on a oil rig boat
An oil rig is an oil platform or oil production platform. A drilling is different though.